How to get the load distance of a crane over a building

Civil Engineering Academy presents a useful video tutorial that provides great benefit to the student who will appear in Civil PE Exam. Thisconstruction video is based on how to obtain the load distance of a crane across a building.

A crane having a 80’ book is applied to provide a load over a building. In this video point X denotes the nearest position of boom toward the building.

Now the question is that what will be the extreme distance that the load contains from the edge of the building if the boom is totally expanded (feet)?




Civil Engineering Academy presents a useful video tutorial that provides great benefit to the student who will appear in Civil PE Exam.

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Wednesday, April 8, 2015

Renovation Construction Budget Spreadsheet

Renovation Construction Budget Spreadsheet
Implementing renovations, alterations or modifications in a construction requires a precisebudget planning. Whether it is a major change or a minor one, line item construction budget spreadsheet helps in preparing cost estimates in an organized and effective manner.

This spreadsheet is very simple to use. Users just need to fill out estimated and actual costs in the yellow cells with budget projections for each of the applicable line items. The rest of the cells are calculatedautomatically. As the project progresses, estimators can use the "Actual Cost" and "Change Order" columns to track their expenditures in relation to their budget projections. The various line items that must be considered to obtain the Total Project Cost include:

Sticks and Bricks: Demolition, New foundation and footings, ConcreteFlatwork- Interior, Foundation repair, Waterproofing, Structural remediation, Termite treatment, Masonry- Tuckpoint/ Repair, Carpentry- Rough Framing, Electrical Service, Water Service, Doors and Windows, Electrical wiring, Doors, Flooring, Painting, Appliances, Miscellaneous Building Materials, etc.

Site: Excavation and Grading, Site improvements, Fencing, Landscaping, etc.

Professional: Consultants like Accountant, Architect, Structural, and others.

Development: Property Acquisition, Property Inspections, Taxes, Insurance, Monthly Utilities like Electric, Gas, Security, Water. Sales Commission, Developer Fee, etc.

Renovation Construction Budget Spreadsheet


Construction Contingency: It is also necessary to provide accurate value for item estimate, unit cost, unit, accepted bid, actual cost, difference and other particulars to attain comprehensive renovation construction budget.


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Tuesday, April 7, 2015

Testifying Tips That Civil Engineering Should Follow

Testifying Tips That Civil Engineering Should Follow
Litigation was the only way to fix the matter whenever a stiff dispute breaks out in a construction project. Alternative Dispute Resolution (ADR) mechanism is such a thing that project stakeholders love to take to resolve those differences such as arbitration, in contract documents.

But the stake holders here always need the participation of civil engineers as fact witness or expert witness in any form of litigation or ADR. The fact witness is one of the parties involved in the dispute, whereas the expert witness is always hired by the parties to give analysis and opinion of one or more issues in the matter.

Despite of the dispute mechanism in work, and whether appearing as a fact or expert witness, civil engineers must have the aptitude to present their position entirely and influentially. The main duty would be to tutor the technical aspect of the case under the curtain to the judges, juries or arbitrators. The civil engineers have to be pursuing the tips and tricks while participating in the dispute resolution process.

Honesty: While making a public statement, civil engineers generally holds the higher standard. Take it an example as Canon 3 of American Society of Civil Engineers (ASCE) Code of Ethics says: “Engineers shall issue public statements only in an objective and truthful manner.” In addition, Guideline (c) to Canon 3 says that when serving as expert witnesses, engineers' view must be taken enough knowledge of the facts and honest conviction. There are many tales in the market doing around those experts helps their clients only, but providing information to judges may be trap from which witness cannot be escape. In spite of codes or guidelines, handing the testimony honestly is the only a noble approach.

Always be prepared: Although there is no solid confirmation or proof that strengthens the proposition, it is probably the former Boy Scouts make the best witnesses. The scouting motto of "be prepared" is pretty an apt for civil engineers allowing an examination in a legal proceeding. Similarly with any project meeting with stakeholders, civil engineers must get ready for their taking-part in dispute resolution. The problem is unavoidable time lag between the time you plan for your testimony and the definite date of the hearing. For example, when the attorneys conduct discovery, such as depositions, a noteworthy amount of time may gone pass. It is vital that you evaluate your file, notes, important exhibits, and documents just ahead of the hearing. Moreover, if you equipped an expert report, you should re-familiarize yourself with not only the report, but also the source documents. Witnesses who are hesitant of how they performed their analyses or reached their conclusion lose trustworthiness. Finally, and while this may seem obvious, it is nevertheless often unnoticed: You must evaluate your deposition transcript. Opposing attorneys salivate at the thought of an engineer making a statement in a hearing that is contradictory with one made in a deposition. In summaries: You can never make out your material too well.

Practice well: Civil engineers know that displaying to clients, project teams, and government officials is a vital part of their responsibilities. It is easy to presume wrongly that testifying is just another display only and there is no need to practice. However, arbitrators, judges, and juries are better capable of understanding the dispute when engineers have practiced the providing unified, understandable, well planned responses to both direct and potential cross-examination questions. In other side, finding for an answer, where it may emerge that the witness is exaggerating a reply on the spot, is not an effectual or credible or convincing means of communication.

Display of professionalism and self-reliance: Most civil engineers would have the same opinion that professionalism is a mannerism that should infuse all facets of their professional lives. Simplicity will leave you an impression with your audience, such as a neat look, sitting erect, and affecting a positive behavior.

Don’t be a problem solver for the opposition: Civil engineers are problem solvers by their nature. They outshine the assisting client and full project team – in determining the action for issues that happen during the design and construction phases of a project. This is a commendable skill, but there may be risk: When opposing counsel asks an undefined question, engineers often view it as a dilemma for resolving, rather than a chance to repeat the position they should be advocating.

Speak to audience: The ASCE "Civil Engineering Body of Knowledge, 2nd Edition," recognizes communication as a vital professional result for civil engineers, who must build up the capability to "plan, compose, and integrate the verbal, written, virtual, and graphical communication of a project to technical and non-technical audiences." When serving as a witness, your first task is to comprehend the mind of the audience to whom you are talking. For example, if the forum is arbitration, the bench of arbitrators almost certainly has more than a passing understanding of construction and engineering ideas. Moreover, arbitrators have the authority to ask for a clarification immediately if they do not fully understand a term or concept. Therefore, a more technically nuanced approach is likely acceptable and advisable.

Calmness: Remaining pleasing and polite and docile and respectful is advisable without difficulty, but tough to continue in stress situations, especially when a fault can be expensive to your side's case. The opposing attorney will often exploit tactics to irritate or upset you. Do not take an attraction. Emotional overreaction or fuming responses may display that you are not a rational or logical person.

Follow the leaders: Engineers, in particular those who have achieved the necessary knowledge and experience to deserve getting job as an experts, are familiarized to directing action from a position of authority. Presenting the case is the attorney's responsibility. Thus, it is important to comprehend that methods for providing testimony are meant for attorney. The civil engineers' knowledge, acquaintance, skill, experience and perspective make them necessary, and they should be permitted to give important input into case preparation and arrangement. The planning and execution of the claim is the attorney's liability, and engineers can not go off the script and steal the show. A useful testimonial technique civil engineers should use is that of the late response. In normal discussion it is not unusual for a person to "step on" a question by reacting before the speaker is finished.

Testifying Tips for Civil Engineering

The answer is given before the question is fully asked. When the engineer is unsuccessful to stay for the attorney to finish the question, it disrupts the flow of an attorney's presentation, and perhaps distracts point the attorney is making. Civil engineers should control themselves to wait their responses for a "beat" – one full second – which permits the attorney to fully extend the question so the answer gives the greatest impact.

Info-Box

If a project dispute arrives at the point where litigation or ADR is needed, it is likely that the claims involved are not easy and regular, but fairly complex.

Through high-quality preparation and professional conduct, civil engineers – whether named as expert or fact witnesses – can give valuable support to judges, juries, and arbitrators wading.

Info-Box

Additionally, following these guiding principles will make the most of the chance to produce a positive domino effect: The first domino is your competent articulation of your position, followed by the thorough education of your audience, with the final domino – hopefully – being a favorable result in the matter.

Reference:-

This is an excerpt from the write-up from John V. Tocco, J.D., is an assistant professor in the Department of Civil Engineering at Lawrence Technological University, published incenews.com

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Monday, April 6, 2015

Electrical Estimating Methods (RSMeans) - an exclusive estimating book for electrical estimators & contractors

Electrical Estimating Methods (RSMeans) - an exclusive estimating book for electrical estimators & contractors
Wayne J. Del Pico has written an exclusive book alias Electrical Estimating Methods (RSMeans) 4th edition. This construction estimating book contains an extensive database of electrical costs and electrical materials which are based RS Means Database.

This estimating book facilitates the electric estimators as well as electrical contractors to apply superior electrical estimating processes through most updated electrical cost data, materials and practices.

With this book the electrical contractors will be able to provide the total cost for materials, labor, overhead and profit precisely.

The book focuses on the following aspects:-
  • Analysis of up-to-date equipment, materials, and processes
  • RS Means data for both residential and commercial projects
  • Case studies that demonstrate greatest practices
  • Avail the current RS Means data online for quick access on the job
Electrical Estimating Methods, Fourth Edition consists of 120+ topics in 26 chapters for exhaustive guideline on offering estimates for virtually any electrical task or project. This edition is aimed at revealing recent labor–hour productivities and practices for procuring material prices compliant with legitimate industry standards and most excellent practices.

The following features are included in this estimating book:-

  • Tables for calculating labor–hours for a series of tasks and conditions
  • Directives for procuring the most synchronized material prices
  • Fresh chapters on electrical demolition, change orders, and project closeout offer a in-depth system to estimating
  • Industry standards and greatest practices from document review with bidding strategies
  • Analysis on bidding strategies, pre–bid scheduling for time sensitive costs, and computer estimating

The contains 288 pages and available in Kindle edition.

Buy the book from Amazon

Wayne J. Del Pico has written an exclusive book alias Electrical Estimating Methods (RSMeans) 4th edition.

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Saturday, April 4, 2015

Webeye cms is an exclusive construction app to monitor the situation in your construction jobsite

Webeye cms is an exclusive construction app to monitor the situation in your construction jobsite
WebEye CMS is the world’s first ever complete cloud supported self observation solution toward the RSI Videofied wireless video alarm system. This construction app is compatible with all android devices.

For any theft or danger situation, the construction professionals can push the SOS panic button or the discreet hot key panic button in-built with the device to transmit an alert to the other commissioned devices for tracking the location of the situation in real time.

This high speed & fully authentic application will facilitate the construction professionals to get rid of any criminal activities and thus enhance the security of the jobsite workers to a great extent.

Webeye puts up the supervising of alarm systems via two ways ranging from a modern browser on any PC or tablet, or a smart phone app.
  • The browser system facilitates the construction professionals to install their own surveillance station with least cost. Here a modern browser is essential.
  • The smart phone app system facilitates to display the related site name, date/time of activation and type of alarm through an alarm list in the smart phone.
For more information, visit www.webeyecms.com


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Friday, April 3, 2015

HeavyBid provides great solution to your construction estimating & construction bidding process

HeavyBid is an easy-to-use construction estimating software that is widely applied in the sectors like transportation, utility, oil and gas, power, industrial, and commercial construction. It is found that over 35,000 estimators as well as 111 companies on the ENR Top 400 contractors list utilize HeavyBid in their projects. HeavyBid supports all the iPad and tablet devices.

Some of the crucial features of HeavyBid:-

  • HeavyBid facilitates the users to produce and sustain live schedules through Primavera and Microsoft Project.
  • HeavyBid supports your current accounting system to easily send your bid correctly to accounting for making budget.
  • Automate the process for creating most of the estimates on the basis of your company’s historical estimating data, and quickly categorizing 100% subcontracted work and arranging it for quotes.
  • The users can obtain numerous estimating data sources along with past estimates, standardized libraries tailor-made to your company, historical estimating costs, historical actual performance data, and incorporated RSMeans.
  • Efficiently control the complete quote lifecycle from RFQ to picking subs and suppliers for producing subcontracts and purchase orders.
  • Instantly evaluate sub and supplier quotes
  • With easy-to-follow work breakdown structure allows the users to systematize your estimate on the basis of what matters the most to you (CSI, DOT, or custom WBS).
  • Multi-level breakdowns facilitate the users to segregate big, composite work into smaller, more controllable and comprehensive pieces.
  • Flexile labor and equipment cost methods aid the users to separate resource costs into their least levels of detail to form the most precise unit costs.
  • Customizable cost types empower the users to track cost individually beyond labor, equipment, material, and subcontractor which are the vital part of the company.
  • With multi-user networks, the users can get access to HeavyBid at the same time. Estimating data is consolidated and distributed, and estimators get the ability to manage their own estimates as well as several users can work up the identical estimate simultaneously.

Download a demo version


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Thursday, April 2, 2015

How to get the load distance of a crane over a building

How to get the load distance of a crane over a building
Civil Engineering Academy presents a useful video tutorial that provides great benefit to the student who will appear in Civil PE Exam. This construction video is based on how to obtain the load distance of a crane across a building.

A crane having a 80’ book is applied to provide a load over a building. In this video point X denotes the nearest position of boom toward the building.

Now the question is that what will be the extreme distance that the load contains from the edge of the building if the boom is totally expanded (feet)?


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~