Wednesday, December 21, 2016

Derivation for quantity in CFT in 1 Bag Cement

On the basis of the capability of the cement to be set in the existence of water, cements used in construction are classified as either hydraulic or non-hydraulic (see hydraulic and non-hydraulic lime plaster).

It will be difficult for non-hydraulic cement, to be set in wet conditions or underwater; instead, it sets once it dries and reacts with carbon dioxide in the air. It is defiant to any chemical attack as soon as it is set.

Density of Cement = 1440kg/m3
For 1 m3 Cement needed is 1440 kg
1 Bag of Cement = 50 kg
For 1 m3 Cement needed = 1440/50 = 28.8 bags
We know, 1 m3 = 35.3147 CFT
Or, 28.8 bags = 35.3147 CFT
Or, 1 Bag = 35.3147/28.8 = 1.226 CFT


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Saturday, December 3, 2016

How to develop stairs – Some useful tricks

By watching this construction video tutorial, one can sharpen his/her knowledge for developing stairs. The video also provides detailed information on how to measure the individual riser height by separating it into the total height among the lower and upper floors as well as estimate individual part perfectly.

While developing stairs, focus should be given on proper layout and some theoretically delicate calculations. Stairs must adhere to stringent building codes to maintain proper safety and climbing comfort.

There are three prime components in a standard staircase like stringers, treads and risers. Stringers, generally cut from 2 x 12s, which belong to the sloped boards for providing support to the other components and bearing the weight of people walking on the stairs. They're usually arranged 16 in. on center. While defining the width of the staircase, wider width is preferred as people can wal on wide staircases securely and comfortably.

Treads build the top surface of every step, and risers are set up directly below the front lip of each tread. Some stairs don't contain risers but it should be avoided as risers safeguard the uncovered endgrain of the notched stringers from the weather.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Thursday, December 1, 2016

Some useful construction tips to calculate excavation of trenches

This construction video provides step-by-step instructions on how to measure excavation and backfill concerning trenches.

Trench stands for an extended excavation that is separated from pits or basements. A footing is a good instance of the trench.

In order to find out the volume of excavation for a simple footing, the following formula is used :-

CL x W x D = Cu.Ft. of Excavation

If you want to change to cubic yards, divide the results by 27

It becomes very difficult while going to make calculation for a trench that includes working spaces and sloped sides. The following formula is used for this purpose.

CL x AD x AW = Cu.Ft. of Excavation


~~~~~~~~~~~~~~~~~~~~