5 Important Points About Preparing Slabs

Concrete Floor Slab is a basic component that comes in numerous structures. The most common ones are the slab-on-grade and suspended slabs. Slab on grade or commonly called SOG is a concrete slab put on the head of completely compacted earth materials.

Suspended slabs, on the other hand, are elevated slabs that structure the tales on each building and rooftop decks. Appropriate elevations and leveling must be done on throwing concrete slabs. Along these lines, settlement because of self-weight loads and other outer power incited by the structure must be considered before the genuine throwing of the slabs, particularly for suspended slabs.

1. Estimating steel bars to deliver on-site

Setting up an estimate to convey on-site must be planned relying upon the need on-site. Venture engineers base the estimate to convey on a list pre-orchestrated by the quantity surveyors. Some venture engineers want to have their individual site engineers check the assessments of the quantity surveyors and contrast it with the real number of steel bars required on-site.

More often than not, the information given by the site engineers wins and is utilized by the obtainment group on acquiring the all out number of steel bars. Besides, engineers consider including at any rate 10% of the genuine assessments as a wastage factor.

As a custom on site, venture engineers and directors have a few steel bar providers; should one provider come up short, the individual has the second provider to deal with.

5 Important Points About Preparing Slabs

~~~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, October 9, 2019

Some useful tips to design a T-beam with the use of limit state method

This construction video briefly describes how to create the design of t-beam with the use of limit state method.
A T-beam (or tee beam) is applied in construction extensively. It is a structural element developed with reinforced concrete, wood or metal. It contains a t-shaped cross section that is formed by a stem and a flange of reinforced concrete or rolled metal.
The top of the t-shaped cross section acts as a flange or compression member in withstanding compressive stresses. The web (vertical section) of the beam underneath the compression flange contributes to withstand shear stress and offer better separation for the coupled forces of bending.
A T-beam has the capacity to tolerate large loads by providing resistance in the beam or by internal reinforcements. It operates similar to singly reinforced beam.
In order to enhance the structural strength of a T-beam, just utilize an inverted T-beam together with a floor slab or bridge deck linking the tops of the beams. If it is accomplished perfectly, the slab performs as the compression flange.

Some useful tips to design a T-beam with the use of limit state method
~~~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~~~

Tuesday, July 9, 2019

How to get rid of common errors in concrete floor slab construction

To get rid of common errors in concrete floor slab construction, various steps like perfect base preparation, mix design, placement, finishing, and curing should be taken.

Typical concrete floor slab thickness in residential construction should be 4 inches. In case the concrete has to sustain extreme loads irregularly, the thickness should be five to six inches; as for instance, motor homes or garbage trucks.

To arrange the base, the ground level should be dug according to the perfect depth to provide for the slab thickness. Take out all organic material and large hard objects like stones and tree roots to a depth of minimum 4 inches. If it is required to develop the grade, apply gravel or sandy soil, and compress the final base with a vibratory plate or equivalent device.

The edge is built up with any straight material that can be fixed into position. If case of constant non-availability of straight lumber, plastic or metal forms should be used. Fix a string line with grade stakes or batter boards to provide a square, level reference prior to place the formwork.

For the concrete mix, it should satisfy the compressive strength requirements (normally 3000 pounds per square inch) devoid of measures that lead to extreme shrinkage. The shrinkage and cracking are increased because of the existence of water, a plasticizer should be used to attain required slump.

Also provide fibers to check plastic shrinkage cracking. Greater strength and entrained air are necessary for exterior slabs susceptible to freezing weather or deicing chemicals.

It is suggested not to add water at the jobsite more than 1 to 2 gallons per cubic yard. In case, extra slump is essential, take advice from the mixer truck driver concerning the quantity of water to be included devoid of taking the concrete out of specification.

Spread the concrete accross the slab area as close to its final position as possible, and then rake it into exact location. Hardens low-slump mixes manually with a vibrator or apply a vibratory screed. Complete with the least force and strokes of the float required to attain a smooth surface.

Develop control joints no farther apart than 24 to 30 times the slab thickness and at no time exceeding 15 feet along both the width and length of the slab by pushing a 1-inch deep grooving tool into the surface.

To keep Joint spacing more than 15 feet, different types of load transfer devices should be used which range from dowels or dowel plates. For slabs with long joint spacing or no joints, steel reinforcement will be suitable.

It will raise the chances for random cracking, but will maintain cracks firmly to keep up superior structural performance.

The curing process should be initiated when the finished surface can counter damage. The concrete should not be enabled to freeze or dry out. Arrange a curing compound over the surface, or apply proper moist curing.

In case of freezing, the slab should be wrapped with an insulator, like insulating blankets or a 4-inch-thick layer of straw that is weighted down so that it can’t blow away. Unless the concrete attains a strength of minimum 500 psi, put the insulator in place. It normally happens within a few days.

Read more

How to get rid of common errors in concrete floor slab construction

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, March 9, 2018

Method of constructing post tension RCC slab

In this construction video tutorial, you will learn how post tension RCC slabs are built up as well as how post tensioning is performed and benefits of post tensioning process.

POST TENSION SLAB: It refers to the slab that is tensioned as soon as the slab is developed. Reinforcement is arranged to avoid the compression.

In Post tension slab, cables or steel tendons are utilized to substitute the reinforcement. Post-tensioning offers a solution to get rid of the natural weakness of concrete in tension as well as optimize its strength in compression.

In concrete structures, this is obtained by arranging high-tensile steel tendons/cables in the element prior to start the casting. If the concrete attains the required strength, the tendons are pulled with special hydraulic jacks and retained in tension with specially designed anchorages which are attached at each end of the tendon.

It creates compression at the edge of the structural member that increases the strength of the concrete for resisting tension stresses.

If tendons are correctly curved to a specific profile, they will exert, other than compression at the perimeter, a useful ascendant set of forces (load balancing forces) that will neutralize applied loads, alleviating the structure from a portion of gravity effects.

In this type of concrete slab, cables are affixed in place of reinforcement. In Steel reinforcement the gapping among bars is 4inch to 6inch while in Post tension slab the gapping is in excess of 2m.

Go through the following video tutorial, to get more details on post tension slab.