adsense analytic

Wednesday, March 26, 2014

Excel Spreadsheet design with Civil Engineering

Civil engineers are professionals who have broad technical knowledge, possess strong problem solving skills and enjoy working with people. Their work is directly related to the public wellbeing and safety, and has a significant impact on decision making processes. This was part of a multi-sheet project for the complete design of an A-frame wood structure.

Originally, a civil engineer worked on public works projects and was contrasted with the military engineer, who worked on armaments and defenses. Over time, various branches of engineering have become recognized as distinct from civil engineering, including chemical engineering, mechanical engineering, and electrical engineering, while much of military engineering has been absorbed by civil engineering.

Civil engineers usually practice in a particular specialty, such as construction engineering, geotechnical engineering, structural engineering, land development, transportation engineering, hydraulic engineering, and environmental engineering. Some civil engineers, particularly those working for government agencies, may practice across multiple specializations, particularly when involved in critical infrastructure development or maintenance.

Excel Spreadsheet design with Civil Engineering

~~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~~~

Tuesday, March 25, 2014

Construction Specifications

A specification (often abbreviated as spec) can be termed as a type of a technical standard to be referenced by a contract or procurement document. It contains the necessary details concerning the specific requirements to be persuaded by a material, product, or service. The specifications are considered very important for suppliers, purchasers, and users of materials, products, or services in engineering, manufacturing, and business as these specifications cover up a extensive collection of general issues like definitions, bidding requirements, legal responsibilities, claims & payments; with details on specific items with respect to all construction project.

CSI (Construction Specifications Institute) is a renowned association that provides the standardization of construction language related with building specifications. CSI offers prearranged instructions for composing specification in their Project Resource Manual. CSI published MasterFormat, an indexing system for categorizing construction data as well as construction specifications. It consists of 50 Divisions, to be applied for integrating facility life cycle and maintenance information into the building knowledge base. Almost the entire CSI approved sections contain performance and safety obligations produced by agencies like the American Society for Testing and Materials (ASTM), Occupational Safety and Health Administration (OSHA), and several other federal and professional organizations. CSI also publish GreenFormat, an online database that includes sustainable product attributes. Manufacturers associated with the construction industry will be able to register product information based on 5 categories in a widespread online questionnaire. All kinds of product information referenced by MasterFormat divisions and titles will be available to designers, specifiers, and building constructors. Given below the detailed lists of construction specifications :-


General Requirements - Division 01

This specification will include particular administrative and procedural requisites that belong to all of the Technical Specification sections. The General Requirements consist of specifics relevant directly to a particular project and written independently for each project. These will develop the expansive administrative and procedural conditions inscripted in the General and Supplementary Conditions documents. These will be applicable to the work of ALL Technical Specification sections. This document also sum ups the scope of work, exercise of the site, owner occupancy of building throughout construction, Phased construction activities, numerous prime contract requisites and eliminations and additions to be connected with the Plans. The General Requirements narrate the Contractor's administrative, procedural and other activities which should be submitted by the Contractor. In General Requirements section the following categories will be available.

Administrative
01010 Summary
01020 Allowances
01030 Alternates
01040 Coordination
01060 Regulatory Requirements
01080 Identification Systems
01090 References
Procedural
01025 Measurement and Payment
01035 Modification Procedures
01050 Field Engineering
01100 Special Project Procedures
01200 Project Meetings
01300 Submittals such as Construction Schedule, Logs
01400 Quality Control
01600 Material and Equipment
01650 Facility Startup/Commissioning
01700 Contract Closeout
01800 Maintenance
Temporary Activities
01500 Temporary Facilities
The Contractor's Responsibility is to comprise these items in Overhead.
Technical Specifications
Divisions 02 - 16 is known as the Technical Specifications. These construction specifications consist of the written description of the specific requirements regarding with a specific product or system. The specification provisions characterize and set up the quality level processes, standards of work and material standards. Each subsection will describe the scope, technical requirements, performance requirements, material suppliers, and quality requirements. The Construction Specifications Institute (CSI) has build up the following standard MasterFormat numbering system that includes the following Continue

~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Monday, March 24, 2014

A new standard of 3D-modeling for civil engineering projects

The Korea Institute of Construction Technology is going to unveil a new standard for 3D-supported construction planning for civil engineering projects like bridges and tunnels.

The standard will be very useful for 3D blueprints. The construction professional can easily detect issues with the visual data throughout construction while working with 2D plans. They can interpret blueprint efficiently and quickly find out if any inconsistency exists. It can result in minimizing building costs by 5 to 8 percent.

The standard will also provide other significant benefits like firmly incorporating multifaceted factors along with material properties and supply-cost information.

The institute is also considering to widespread the range of the 3D-modeling standard to other building sectors.

A new standard of 3D-modeling for civil engineering projects

~~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~

Friday, March 21, 2014

Concrete Estimate Construction Template

Concrete Estimate template is designed to assist in taking-off a variety of concrete applications, such as, Footings, Thickened Edge Footings, Concrete Walls, Columns and Paving.

It generates take-off quantities automatically based on the information the user inputs into the various template form fields. For example, the template will calculate the amount of steel reinforcing in tons for any given application.

Concrete Estimate Construction Template

~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~

Tuesday, March 11, 2014

Construction Specifications

A specification (often abbreviated as spec) can be termed as a type of a technical standard to be referenced by a contract or procurement document. It contains the necessary details concerning the specific requirements to be persuaded by a material, product, or service. The specifications are considered very important for suppliers, purchasers, and users of materials, products, or services in engineering, manufacturing, and business as these specifications cover up a extensive collection of general issues like definitions, bidding requirements, legal responsibilities, claims & payments; with details on specific items with respect to all construction project.

CSI (Construction Specifications Institute) is a renowned association that provides the standardization of construction language related with building specifications. CSI offers prearranged instructions for composing specification in their Project Resource Manual. CSI published MasterFormat, an indexing system for categorizing construction data as well as construction specifications. It consists of 50 Divisions, to be applied for integrating facility life cycle and maintenance information into the building knowledge base. Almost the entire CSI approved sections contain performance and safety obligations produced by agencies like the American Society for Testing and Materials (ASTM), Occupational Safety and Health Administration (OSHA), and several other federal and professional organizations. CSI also publish GreenFormat, an online database that includes sustainable product attributes. Manufacturers associated with the construction industry will be able to register product information based on 5 categories in a widespread online questionnaire. All kinds of product information referenced by MasterFormat divisions and titles will be available to designers, specifiers, and building constructors. Given below the detailed lists of construction specifications :-

General Requirements - Division 01

This specification will include particular administrative and procedural requisites that belong to all of the Technical Specification sections. The General Requirements consist of specifics relevant directly to a particular project and written independently for each project. These will develop the expansive administrative and procedural conditions inscripted in the General and Supplementary Conditions documents. These will be applicable to the work of ALL Technical Specification sections. This document also sum ups the scope of work, exercise of the site, owner occupancy of building throughout construction, Phased construction activities, numerous prime contract requisites and eliminations and additions to be connected with the Plans. The General Requirements narrate the Contractor's administrative, procedural and other activities which should be submitted by the Contractor. In General Requirements section the following categories will be available.
Administrative
01010 Summary
01020 Allowances
01030 Alternates
01040 Coordination
01060 Regulatory Requirements
01080 Identification Systems
01090 References
Procedural
01025 Measurement and Payment
01035 Modification Procedures
01050 Field Engineering
01100 Special Project Procedures
01200 Project Meetings
01300 Submittals such as Construction Schedule, Logs
01400 Quality Control
01600 Material and Equipment
01650 Facility Startup/Commissioning
01700 Contract Closeout
01800 Maintenance
Temporary Activities
01500 Temporary Facilities
The Contractor's Responsibility is to comprise these items in Overhead.
Technical Specifications
Divisions 02 - 16 is known as the Technical Specifications. These construction specifications consist of the written description of the specific requirements regarding with a specific product or system. The specification provisions characterize and set up the quality level processes, standards of work and material standards. Each subsection will describe the scope, technical requirements, performance requirements, material suppliers, and quality requirements. The Construction Specifications Institute (CSI) has build up the following standard MasterFormat numbering system that includes the following Continue

~~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com.
~~~~~~~~~~~~~~~~~~~~~

Monday, March 10, 2014

Quantity-take-off Sheets

Quantity takeoff or estimating sheet is the general form of listing and taking off types, sizes and quantities of material required in a bidding process of any construction work. This quantity takeoff sheet also includes ductwork, piping, labor, risk cost and summation of all the estimated expenditure.

Quantity-take-off Sheets

In a general bidding process of any construction work, the project estimation is the most vital thing to win the process. An almost accurate quantity takeoff sheet helps the architects, engineers and contractors to win any bid. So it is very important to get an almost accurate estimation of the project.
An estimating is very much important for contractor to record a description to calculate material, man hours, labor, equipment and subcontractors totals.


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~


Friday, March 7, 2014

Special Interest Efforts to Subvert Energy Efficiency Bill in Federal Buildings Opposed by Groups

There is a new step in the approval process for developers who are looking to establish their business to Carrboro.


The American Institute of Architects (AIA) and more than 1,000 businesses around the country has asked the Congress to decline the special interest efforts to cancel the law setting goals for minimizing the use of fossil fuel in federal buildings by 2030.

The response is based on report regarding the incorporation of a repeal of Section 433 of the Energy Independence and Security Act, by the gas and oil lobby, in the bipartisan Shaheen-Portman energy efficiency bill.

The AIA CEO Robert Ivy, FAIA informed that the demand of removing federal energy laws through in the Shaheen-Portman bill by the fossil fuel industry is an unfortunate incidence. He also added that they are in support of the original bill with various admirable provisions as Sens. Shaheen and Portman has spent more than 2 years to craft a bipartisan energy efficiency bill. They cannot support the legislation that weakens the laws meant to support the federal government in saving taxpayers money by conserving energy.

The Senate Energy and Natural Resources Committee had earlier approved the bipartisan Shaheen-Portman bill that encouraged families, businesses and the government to conserve energy. It is still unknown if the revised bill advance any further in its current form. Ivy assured that they are committed to find a solution that would lead to the improvement of Section 433. But he also added that as long as the opponents ask for a complete repeal, the bill can probably not serve the interests of the public of America.

The design and construction companies in and around the country are designing buildings that meet and often exceed the present targets in Section 433. Due to Section 433, design companies are capable to generate new design strategies that are employed to support clients from private-sector to minimize their energy loads.

Special Interest Efforts to Subvert Energy Efficiency Bill

~~~~~~~~~~~~~~~~~~~~~~
published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~~~