adsense analytic

Friday, June 6, 2014

Flat Roof and Subcontractor for Coverings Estimating Module

This video clip will show you how the Flat Roof and Subcontractor for Coverings Estimating Module works.

Easy Price Pro has over 135 Estimating Modules to select from - you are able to add them to your Renovations and Alterations Utlra program.

The program will make all the calculations for you and will produce a range of professional reports (e.g. Material Order Sheet, Bill of Quantities, Written Quotation) automatically.


~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Thursday, June 5, 2014

Monitor and Control Excel Sheet for General Contractor

The must have Excel sheet for every Planning Engineer, Project Manager, Construction Manager, and whoever is involved in monitoring and controlling projects.


I created this Excel sheet from my best practices working as Planning Manager during my 11 years experiences. Do the scheduling in Primavera, and the Reporting, Monitoring, and Controlling in Excel.


Purchase The Excel sheet from the following link:www.planningengineer.net


Watch the following videos for more information about monitoring and controlling excel sheet:


~~~~~~~~~~~~~~~~~~~
Publsihed By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Tuesday, June 3, 2014

30-story building built in 15 days

The Chinese sustainable building company, Broad Group, has yet attempted another impossible feat, building a 30-story tall hotel prototype in 360 hours, after building a 15-story building in a week earlier in 2011.


You may ask why in a hurry, and is it safe? The statistics in the video can put you in good faith. Prefabricated modular buildings has many advantages over conventional buildings.


The building was built over last Christmas time and finished before New Years Eve of 2012.


~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Monday, June 2, 2014

World's Longest Sea Bridge Construction

An engineering marvel the Jiaozhou bay bridge has finally opened up after four years of construction. The 26.3 miles long bridge links the port city of Qingdao to the island of Huangdao.


The road bridge, which is 110ft wide and is the longest of its kind, cost nearly £1billion to build.


A bridge over misty waters: The immense £1billion structure which is supported by more than 5,000 pillars stretches for 24 miles along China's eastern port city of Qingdao to the offshore island Huangdao.


It took four years to build the bridge, which is supported by more than 5,000 pillars across the bay, and it is almost three miles longer than the previous record-holder - the Lake Pontchartrain Causeway in Louisiana.


~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Saturday, May 31, 2014

Make your construction estimating process smarter with aspenOne V8.6

Aspen Technology, Inc. (AZPN), the most trusted solution provider in engineering and optimization software, just unveiled the availability of aspenONE version 8.6 software. The latest AspenTech software is ideal for Engineering & Construction (E&C) as well as Oil, Gas and Chemicals industries to design and maneuver protected plants, calculate project costs precisely from concept to construction.

Benefits of construction estimators:-

Aspen Capital Cost Estimator (ACCE) comprises of newest detailed unit rate estimating which allows the estimators to make calculations into the detailed estimating phase of a project. ACCE V8.6 can easily modify the labor and material unit rates along with materials of construction. This feature enables organization to gain up to +/- 10% exactness and minimize project risk as well as enhance decision creation around the utilization of capital.

ACCE V8.6 facilitates the user to penetrate unit pricing, unit labor, and alter the description of line items in the bulks. Now ACCE can also be applied for figuring out detailed estimates as previously the users were unable to use detailed pricing which is now resolved.

ACCE V8.6 is will save considerable time on estimate, develop the correctness and accuracy of estimates with the progression of any project. The communication amid the estimator and the client as well as will collaboration among engineering disciplines will be enhanced to a great extent. The owners will be able to utilize their capital resource in a superior way under the escalation of cost in the energy and chemical sectors. Strategic Estimating Systems (SES) will be mostly benefitted with this new functionality.

The V8.6 release of aspenONE software, featuring updates to Aspen HYSYS, Aspen Plus, and Aspen Capital Cost Estimator, is available immediately. Customers having the aspenONE Licensing Model can promote to the new version without incurring any extra cost.

For getting more updates visit, http://www.aspentech.com/products/v8-release

Make your construction estimating process smarter with aspenOne V8.6  
~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Friday, May 30, 2014

Saudi Arabia Aims to Construct World's Tallest Building

Construction work begins for Saudi Arabia's Kingdom Tower in Jeddah, which once completed is expected to take the record as the world's tallest building.


Three years ago Saudi billionaire Prince Al Waleed bin Talal announced to the world that the Kingdom intended to construct the world's tallest building, in a move to outbid Gulf neighbour Dubai.The tower, to be named Kingdom Tower, will be at least 3,280 ft, and will be the centrepiece of the Kingdom City development in Jeddah.

Dubai's Burj Khalifa is currently the tallest building in the world with a height of 2,716 feet.Designed by architects Adrian Smith and Gordon Gill, Kingdom Tower is expected to cost 1.2 billion U.S. dollars to construct.


"The main anchors of phase one will be the tower, the highest tower in the world, the icon of this project it will be the landmark and icon of the city of Jeddah and The Kingdom of Saudi Arabia," Mounib Hammoud, CEO of Jeddah Economic Company (JEC), said in an interview on Sunday."Phase one, will start being completely taking shape in 2018 because the tower will hopefully finish in 2018.


~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Thursday, May 29, 2014

Common Cost Estimation Practice Traits

There are various issues that must be considered to avoid construction risks and some of the common cost estimation practice traits that must be followed in order to enhance the entire process are given below-

Consistency- Methods that are consistent with the industry standard classification systems such as the UniFormatT or CSI MasterFormatT systems as well as in logical order should be employed. The methods that meet the specific requirements of the client should be used. Employing consistent methods helps different estimators to complete various parts of the quantity survey and can also be continued later by another cost estimator. Through consistency cost fluctuation throughout the different project stages can be easily identified. This survey helps in creating the final account summary.


Documentation- Documentation is a crucial part of cost estimation practice. Documentation of all the segments of estimation should be done in a consistent, logical, precise and legible manner. If any specific detail is found to be vague, estimators should review the original estimate for reference. Clarity in documentation enhances its importance to the reader and turns out to be of great help in matters like settlements of claims, change order preparation and review of past estimates.

Verification- For easy and accurate verification, the quantity survey must be carried in a logical and methodical form which works as proof of the accuracy of any portion of the survey.

Evaluation- Evaluation of the bids must be done whenever the estimate involves use of bids from subcontractors. This helps in the scope and responsiveness to the project. Past performance records of the subcontractors submitting bids must be over viewed in this context as this would aid in determining the level of competence as well as the standard of performance.
 

~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~