On site demonstration on setting up formwork for concrete beam construction

Formwork in concrete construction is nothing but a mold for a structure where fresh concrete is poured with the purpose of solidifying it consequently. Formwork is temporary structure and generally it is not demonstrated in the drawings. Types of formwork for concrete construction are based on the material of formwork as well as type of structural element.
Formworks is also categorized on the basis of the type of structural member construction like slab formwork to be applied in slab, beam formwork, column formwork to be applied in beams and columns respectively.
Formwork Materials.
• Wood
• Either all-wood or some wood components
• Plywood
• Aluminum
• Steel
• Plastics
In this construction video tutorial, one can learn how to arrange formwork for concrete beam construction.
Beam formwork is generally formed with either timber or metal panels. In this type of formwork, the process is to produce a box surrounded with frames at the perfect size of the beam and fasten it firmly on the kicker left from base or at the last phase of beam concreting. The box is detained in exact position with steel column clamps or bolted yokes and supported with timber studs or props.
Consideration should be given on the following points for formwork construction It is hard enough to resist all types of dead and live loads.
It should be built up tightly and sustained competently and braced both horizontally and vertically with the intension of preserving its shape.
The joints in the formwork should be firm against seepage of cement grout.
The formwork should be arranged correctly to the preferred line and levels with plane surface.
The material of the formwork should not be twisted when comes in contact with the elements.
It should be supported with firm base.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~

Wednesday, April 5, 2017

Estimator Required - Formwork & Concrete Structure contractor

A renowned and 15 years old formwork & structures contractor located in Melbourne's Western suburbs, is seeking an experienced, methodical and perfect estimator on permanent basis to work in tandem with estimating manager of the company.
Eligibilities :-
Should have at least 2 years of working experience in a commercial.
structures/formwork environment (either main contractor or sub-contractor side) Should contain sound knowledge and capability for pricing formwork systems, concrete, groundworks etc.
Should be good technical savvy and contain the ability for reading and annotating structural drawings.
Should have the capacity to estimate precisely and prepare full BOQ.
Should have the capability for transactional contract administration like progress claims and variations management.
Should be a self motivated person and have the ability for working devoid of micro-management.
Salary will be offered on the basis of the experience that ranges from $70,000 - $110,000.
The interested candidates can send their CV in word format to Jono Conley at Constructive Recruitment by clicking on the following links.
N.B.: Only nominated candidates will be contacted directly.
Formwork & Concrete Structure contractor

~~~~~~~~~~~~~~~~~~~~~~~~

Published By

Rajib Dey

www.constructioncost.co

~~~~~~~~~~~~~~~~~~~~~~~~


Wednesday, December 28, 2016

Example of Concrete Slab Formwork Design

This example problem of a Concrete Slab Formwork design using an excel spreadsheet is very handy for all construction professionals out there.

This tutorial shows how to configure a spreadsheet with the purpose of design the spacing of joists, stringers and shores for a concrete slab form.

In this tutorial you will learn a step by step guidance delivered by matt hallowell. Enjoy the tutorial below:


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~