Some best formwork methods

Formwork means the temporary or permanent molds which are applied to retain wet concrete unless it gets cured. It is a vital component in concrete construction as without formwork the schedule, labor requirements, quality and total cost of a project are significantly impacted.

In due course of time, formwork molds have changed from conventional job-built timber to pre-engineered systems comprising of a combination of steel, aluminum, manufactured timber, plywood and plastics.

These improvements in formwork molds make the jobsite production & safety better, with fewer labor, whereas creating a superior finished product.

Walls—Now-a-days, steel-framed, wood-faced panels, which need consumable ties at 2-feet-on-center and one connection per square foot, are extensively used for handset wall forming. These are substituted with larger, two-person handset systems which need less labor and get rid of consumable purchases due to reusable taper ties.

In recent times, clamp connection forms having wood or plastic form faces that offer tremendous labor savings in assembly, are utilized. Assembly and reconfiguration of these standard systems to satisfy changeable structure dimension takes place instantly, and also offers a consistent concrete finish.

Slabs—The application of fixed or tailor-made wood posts, stringers and joists is still considered as the most common method of shoring of slabs. This method delivers from generation to generation and considerable labor is required for that. Since, the posts are arranged as close as 2-feet-on-center, construction sites turn out to be very congested.

A new construction method that highlights engineered lumber and metal posts raise the post spacing up to 5 feet by 10 feet and suggests components which are systematic and can be reprocessed. This increases spacing and facilitates less material on site to develop the same slab area. Less material leads to lowered handling requirements, less labor to arrange and strip the formwork, fewer transport costs, and an improve overall job site productivity.

The existing method for gang-forming slabs applied trusses or structural decks based on significant amount of time for assembly and disassembly. Besides, this method requires a huge amount of crane time, thus accelerating the time for resetting a suitable operating method. The customer should also purchase the plywood facing and often restore it several times on the same project.

Gang-forming slabs are commonly found on the structures with height in excess of 15 stories with the purpose of reducing cost. To provide a greater solution to these types of systems, smaller tables are arranged to the job site fully assembled with plywood especially for mid-rise buildings where gang-forming was not inexpensive earlier.

The formwork-lifting elevators affixed to the exterior of a building that facilitates all formwork to be cycled from floor to floor devoid of requiring a crane to decrease job site crane time & formwork labor requirements. These table-lifting systems are applied along with the smaller table method and also allow for other construction material like handset shoring, vertical formwork and reshores from below to cycle from floor to floor with a crane.

How to choose the exact formwork

Structural engineers should be aware that concrete contractors carry out a detailed analysis of available formwork solutions to arrange the best system for the construction project since conditions differ for each individual project, there is no simple formula for the selection of the proper formwork supplier or system.

Generally, formwork should include 40- to 60-percent of the total cost of a building’s structural concrete frame. For concrete walls, the cost remains 50- to 60-percent range. These percentages involve the cost of material and labor, with the largest cost being for labor. It is vital to analyze the labor costs comprehensively since it is the higher expenditure and is that amount is decreased, it offers superior effect on the bottom line.

To provide the most effective solution for a project, a contractor will calculate different forming systems. Since the scarcity of available and capable labor continues, it has become even more important to opt for proper forming system. So, there are two options for a contractor - a low-priced forming material that is labor-intensive or a forming system that is costly but offer high productivity.

To get more details, go through the following link csengineermag.com

Some best formwork methods

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, April 12, 2017

On site demonstration on setting up formwork for concrete beam construction

Formwork in concrete construction is nothing but a mold for a structure where fresh concrete is poured with the purpose of solidifying it consequently. Formwork is temporary structure and generally it is not demonstrated in the drawings. Types of formwork for concrete construction are based on the material of formwork as well as type of structural element.
Formworks is also categorized on the basis of the type of structural member construction like slab formwork to be applied in slab, beam formwork, column formwork to be applied in beams and columns respectively.
Formwork Materials.
• Wood
• Either all-wood or some wood components
• Plywood
• Aluminum
• Steel
• Plastics
In this construction video tutorial, one can learn how to arrange formwork for concrete beam construction.
Beam formwork is generally formed with either timber or metal panels. In this type of formwork, the process is to produce a box surrounded with frames at the perfect size of the beam and fasten it firmly on the kicker left from base or at the last phase of beam concreting. The box is detained in exact position with steel column clamps or bolted yokes and supported with timber studs or props.
Consideration should be given on the following points for formwork construction It is hard enough to resist all types of dead and live loads.
It should be built up tightly and sustained competently and braced both horizontally and vertically with the intension of preserving its shape.
The joints in the formwork should be firm against seepage of cement grout.
The formwork should be arranged correctly to the preferred line and levels with plane surface.
The material of the formwork should not be twisted when comes in contact with the elements.
It should be supported with firm base.


~~~~~~~~~~~~~~~~~~~~~