Steps involved in cement concrete works

Given below, brief specifications for executing cement concrete works for different objectives :-

1. Materials for Cement Concrete: Different types of materials cement, aggregates and water are required for cement concrete works. The aggregates are categorized as fine aggregates (sand) and coarse aggregates. The aggregates should comprise of inert material and should be clean, dense, hard, robust, long-lasting, non-absorbent. Besides, it should have the ability to make superior bond with the cement mortar.

Cement - Fresh Portland cement or pozzolana Portland cement (PPC) should be used according to requirement or specification and should contain the necessary tensile and compressive strength and fineness.

Fine Aggregates - Course sand with hard, sharp and angular grains should be utilized as fine aggregate or sand and it should get through 5mm (3/16”) square sieves or mesh. It should contain standard quality and does not contain dust, dirt and organic matters. Sea sand is not recommended for concrete works. Fine aggregates should comprise of crushed stone or manufactured sand if indicated.

Coarse Aggregates - These should comprise of hard broken stone of granite or similar stone and does not contain dust, durst and other foreign materials. The size of stone ballast should remain 20mm (0.75 inches) and less and should be arranged on 5mm (0.25 inch) square mesh. These should be well grades to retain voids under 42%.

The size of coarse aggregate is based on the thickness of concrete and nature of work. As for instance, size of coarse aggregates for building works should remain 20mm and 40mm to 60mm sizes are applied for road work and mass concrete works.

Water - The quality of water should be same as drinking water and it does not contain alkaline and acid matters.

2. Proportioning of Cement Concrete: The proportions in cement concrete should be according to the design and strength requirements. The proportion can be 1:2:4 (M15 concrete) or 1:1.5:3 for M20 concrete. The proportions of 1:2:4 concrete include the ratio of cement: sand: coarse aggregates by volume until indicated. Least compressive strength of concrete of 1:2:4 mix proportion should be 140 kg/sq.cm or 2000 lbs/sq.in on 7 days.

3. Measurement of Materials: Sand and coarse aggregates are calculated by volume with boxes. Cement should not be calculated by box, one bad of cement of 50kg weight should be treated as 1/30 cu.m or 1.2 cu.ft volume. Size of measured boxes may be 30 cm x 30 cm x 38 cm or 35 cm x 35 cm x 28 cm similar to the content of one bag of cement.

All materials should be dry and in case of utilizing damp sand, compensation should be done with extra quantity sand to the extent necessary for bulking of sand.

4. Mixing of Cement Concrete: Mixing of concrete should be done with machine to attain superior quality. For small works, hand mixing by batches is suitable.

5. Checking for Concrete Slump: Slump test should be conducted constantly to control the addition of water and to retain the desired consistency. A slump of 7.5cm to 10 cm (3 inches to 4 inches) is perfect for building work and 4 cm to 3 cm (1.5 inch to 2 inches) is ideal for road work.

6. Formwork for Concrete Works: Formwork centering and shuttering should be arranged as per need and the standard specifications prior to place concrete to confine or to support or to retain the concrete in exact location. The inside surface of the concrete should be oiled with formwork oils so that the concrete can’t stick to it.

Before placing concrete, water should be sprinkled over the base and formwork where the concrete will be arranged. Forms should not be detached prior to 14 days in general, side forms may however be detached after 3 days of concreting.

7. Placing of Concrete: It is necessary to place concrete gently in layers not surpassing 15cm or 6 inches and it should be consolidated by pinning with rods and tamping with wooden tampers or with mechanical concrete vibrating machines unless a solid concrete is produced.

Concrete should be placed constantly. If the placing of concrete is postponed for rest of the day or for the following day, the end should be sloped at an angle of 30 degrees and made rough for jointing again.

Curing of Concrete: After about two hours of placing when the concrete starts to become solid gradually, it should be retained moist by covering with wet gunny bags or wet sand for 24 hours and then curing by flooding with water making mud walls of 7.5 cm or 3 inches high or by covering with wet sand or earth and kept damp constantly for 15 days.

Steps involved in cement concrete works

Read more
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Tuesday, March 20, 2018

How to perform slump cone test for testing the workability of concrete

This construction video tutorial is based on slump cone test. It is one of the most recognized field tests on fresh concrete.

Slump test is undertaken to evaluate the functionality of fresh concrete as well as verify the water ratio and the consistency of concrete from batch to batch.

The instruments which are used in slump test comprise of a mould shaped like the frustum of a cone having the following dimensions :-

Bottom Diameter : 200 mm
Top Diameter : 100 mm
Height : 300 mm
Tamping rod of steel should contain diameter of 16 mm, 600 mm long and rounded at one end.


The following methods are used to work out slump :-

nternally and externally cleanse the inner surface of mould without applying any grease or oil.

Fill the mould with concrete in 4 layers.

Tamp each later with 25 strokes of the rod to get rid of bubbles and voids.

Allocate the strokes consistently over the whole cross-section of the mould.

The rod should infiltrate each bottom-line layer.

By applying a trowel, eliminate surplus concrete after the top layer.

Take away mould gradually and vertically.

The concrete will slump or slide.

Calculate the slump height in mm.

To maintain normal functionality, the slump should not be over 50 mm.

Cleanse the slump cone.

To get more detailed information, go through the following video tutorial.



~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~

Saturday, November 4, 2017

Brief overview of workability of concrete

The strength & longevity as well as the cost of labor and look of the finished product is greatly impacted by the workability of concrete. The concrete can provide better functionality, if it is easily positioned and compacted consistently devoid of bleeding or Segregation.

The concrete that is not in good working condition should be supported with extra work and endeavor for being compacted in position, also honeycombs &/or pockets are also found in finished concrete.

Definition of Workability: Concrete workability defines how smoothly freshly mixed concrete is amalgamated, arranged, compacted and finished by keeping the conformity as it is. Workability refers to a property that directly affects strength, quality, appearance, as well as the cost of labor for placement and finishing operations.
The workability is impacted with the following factors :
1. Water content in the concrete mix
2. Amount of cement & its Properties
3. Aggregate Grading (Size Distribution)
4. Nature of Aggregate Particles (Shape, Surface Texture, Porosity etc.)
5. Temperature of the concrete mix
6. Humidity of the environment
7. Mode of compaction
8. Method of placement of concrete
9. Method of transmission of concrete
The workability of concrete can be improved in following ways :-
1. Raise the proportion of water/cement
2. Raise size of aggregate
3. Apply well-rounded and smooth aggregate rather than asymmetrical shape
4. Rise the mixing time
5. Enhance the mixing temperature
6. Employ non-porous and saturated aggregate
7. Include air-entraining mixtures
The most recognized method for measuring the workability of concrete is Slump Test.
Brief overview of workability of concrete

~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~