Guidelines for reinforced cement concrete design

This construction video provides detailed guidelines for designing reinforced cement concrete with adherence to the Indian National Building Code (IS 456 – 2000).
This code is designed for general structural application of plain and reinforced concrete. This code employs the limit state design approach along with working stress design approach. It provides wide-ranging information on the different characteristics of concrete.

It comprises of the following five sections and eight annexures:
• Section 1: General
• Section 2: Materials, Workmanship, Inspection and Testing
• Section 3: General Design Considerations
Section 4: Special Design Requirements for Structural Members and Systems
• Section 5: Structural Design (Limit State Method)
By going through this video, you will learn how to design various types of structural components like beam, column, slab, footing etc. as well as objective of structural designing.
The video briefly explains the following topics :-
1. Purpose of structural designing and designing method
2. Variation among plain concrete and reinforced concrete
3. Fundamental characteristics of concrete as follow
a. Grade of concrete
b. Characteristics strength of concrete
c. Modulus of elasticity of concrete
d. Creep and shrinkage
e. Longevity
f. Tensile strength
4. Fundamental properties and categories of reinforced steel
a. Grade and categories of steel
b. Yield strength of mild steel and HYSD Bars

Watch the following video for online demonstration.



Read continue

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co

~~~~~~~~~~~~~~~~~~~~~~~~

Tuesday, June 27, 2017

Learn to compute cement quota, brickwork volume & no. of fixes for a brick wall

This construction video tutorial will show the details of cement quota, brick work volume, number of fixes for a brick wall construction.
To calculate the brickwork volume, just apply the following formula :-
Total brickwork area x wall thickness
= 31.98 x 0.2 = 6.38 m3

The ratio of cement & mortar needed in brickwork is 1:3 (it can also be taken as 1:5 and 1:6).
Volume of brickwork = 6.38 m3
For 1 cubic meter of cement mortar, the volume of sand will be 0.2m3
For 6.38 cubic meter, the volume of sand will be 6.38 x 0.2 = 1.276 m3
For 1m3 cement mortar, the volume of cement will be = (0.2x1440)/3 (3 denotes last digit of ratio)
= (0.2 x 1440)/3 = 96 KGS
For 6.38 cubic meter, the volume of cement will be 6.38 x 96 = 612.48 KGS
To work out the number of cement bags, just divide it by 50 (as weight of 1 cement bag is similar to 50 Kg)
Therefore, 612.48/50 = 12.24 bags = 13 bags (approx.)



Read more

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co

~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, June 7, 2017

How to calculate the quantities for steel, cement, sand & aggregates in a flat slab

This construction video tutorial will produce some useful tips on how to find out bar bending schedule of flat plate slab as well as work out the quantities of different materials like steel, cement, sand & aggregates inside a slab.

In this video a sample slab drawing is taken and it’s length and width are 2 meters and 5 meters. Clear cover for this slab is 25 mm. Main bar as well as distribution bar contain the size of 12 mm. Center to center distance is 150 mm. The density of the slab is 125 mm.

The mix grade used in the slab is M15 in the proportions 1:2:4.

The quantities will be calculated on the basis of the above dimensions.

To learn the complete process, watch the following youtube video.