Tuesday, July 22, 2014

How to hold a subcontractor by the contractor to its bid

Many times, the contractor has to face problem for relying on the subcontractor’s low bid as after being awarded the prime contract to the contractor, the subcontractor refuses to work at the price originally bid.

In this situation the contractor has no alternative than hiring a subcontractor from a different company at higher charges.

So it is important for a contractor to assess properly whether he/she can hold a subcontractor to its bid.

The contractor should consider the following points to perform the same.
·         Suppose the subcontractor provides only an estimate of the cost of the work without proposing to create a specific offer for executing the work at that price. 
·         Suppose the subcontractor’s bid or proposal is made unpredictable specifically or needs modification. Is there an apparent and clear-cut offer under such situations? 
·         Should the subcontractor contain genuine knowledge and anticipation that the contractor will apply his bid or proposal while suggesting a bid or proposal for the total project? 
·         Is there any rules or regulation in the construction industry that ensure the reliability of a subcontractor upon which a contractor can trust in the subcontractor’s bid or proposal in the making of the contractor’s overall bid or proposal on the project? 
·         Does the subcontractor’s bid or proposal varies to a large extent from the other bids or proposals that the contractor obtained? 
·         Is there an evident mathematical miscalculation in the subcontractor’s bid or proposal that the contractor can notice apparently? 
·         Is the subcontractor’s bid or proposal much lower as compared to other quotes obtained on the same project?  If so, does the contractor undertake any method to authenticate or certify the subcontractor’s bid or proposal? 

·         Does the contractor give the wrong impression about an inexperienced subcontractor ensuring that the subcontract work can be accomplished at a price offered by the contractor when that price undervalued the accurate cost of performance?

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~

Tuesday, June 3, 2014

30-story building built in 15 days

The Chinese sustainable building company, Broad Group, has yet attempted another impossible feat, building a 30-story tall hotel prototype in 360 hours, after building a 15-story building in a week earlier in 2011.


You may ask why in a hurry, and is it safe? The statistics in the video can put you in good faith. Prefabricated modular buildings has many advantages over conventional buildings.


The building was built over last Christmas time and finished before New Years Eve of 2012.


~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Wednesday, February 26, 2014

Dawlish Rail Repair to Complete by Mid April

The railway line at Dawlish in Devon, which was severely damaged during the recent storms, is expected to be repaired by the middle of April. It was originally planned to be repaired by March, but further storms delayed the work and besides has caused more damage to the site.


Various seawalls next to the line were destroyed by the recent storm. Part of the temporary seawall of stone-filled shipping containers that was erected after the first part of the seawall collapsed at the start of the month, was also destroyed.

The Dawlish railway line is considered as a significant link between London and the far south-west of England. The route managing director of Network Rail Western, Patrick Hallgate, said that its engineers would be "working night and day" to complete the work.

Managing director of the First Great Western train company, Mark Hopwood, said that it will run trains between Exeter and London and between Newton Abbot and Penzance joined by bus services. He also added that this will permit them to repair the train services that link London and Exeter with Torbay, Plymouth and Cornwall.

Network Rail is putting efforts by working round the clock to open the line so that the services can be resumed at the earliest. Till the reopening of the lines, the train services are running between Exeter and London and between Newton Abbot and Penzance. Besides, bus services are linking these stops for the convenience of the passengers.

Dawlish Rail Repair to Complete by Mid April

~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~

Monday, July 8, 2013

How to estimate the cost of Material

Material Pricing 

The price of the materials is calculated in two different methods :-

        • Lump Sum
It is a process to supply all the Materials in a group. As for instance a steel supplier may propose to provide all of the structural steel, steel Joists and roof deck for an approved price.

        • Unit Price
It is a system provided by the supplier to supply the materials at a price per unit.

A ready mix concrete supplier may recommend to deliver 3000 psi concrete to the project for a price of RM 110 per cubic yard.

Quantity TakeOff 

It is a procedure to find out the required construction quantities. It can be segregated into :-

        • Forecasting of the quantities of work
        • Working out of the prices related to those quantities

Quantity TakeOff Procedures :-

Classification of work item– for instance : Brick wall section or concrete footing.

Estimation of quantity varying from linear, area, volume and unit.

After calculating the material take‐off, estimator can gather brief knowledge on the actual field procedure. Concrete take‐off will commence from volume for footings, grade beams, slabs and slabs for ground floor etc.

Generally quantity quantity take‐off is performed by the application of forms. In order to regulate the worksheets, provide accurately allocated areas in which proper information is to be submitted facilitating follow-up for smooth evaluation.

Pricing Materials

It is a system for allocating a RM value for a work item following a projected specification and prearranged A process quantity needed.

          • After completion of quantifying of materials, the calculation of cost of materials should be started.

          • The pricing of each work item should consist of the individual subcomponents :-

                   Procurement of permanent and temporary materials
                   Labor needed for setting up the materials
                   Equipment necessary for shifting and installing materials
                   Other consumables, eg. Fuel and tools Material costs

• In general, the amount of purchase = the unit price, which is recognized as quantity discount.

Freight cost should be taken into consideration and included in the direct cost of the materials. This is very important if the site location is very distant from nearby suppliers.

Other concerns for material procurement:

           – Quantity discount
           – Interest rate
           – Escalation
           – Holding cost
           – Credit facility
           – Allowance for method of measurement of the bill item

Material Pricing basis

• Resources of pricing information:

            Published resources – Building Cost Indices
            Company Cost records – an in-house record of accurate documenting and compiling company      cost from earlier jobs
            Vendor catalogues and quotations – prices are acquired directly from vendors from catalogues or indirect inquiries.

While Upon assembling prices from vendor, the following points must be taken into consideration:

            Payment requirements – cash, credit, credit term
            Delivery charges
            Lead time, product availability
            Price guarantee
            Quantity discount information
            Price rises clause

~~~~~~

Posted By Rajib Dey
Content Writer