Wednesday, February 14, 2018

The Basic Requirements of Formwork

Formwork is a concrete construction that is used as either short or permanent molds into which fresh concrete or similar kind of materials are gushed to make it harden. The different types of concrete formwork construction depend on the material and the kind of structural element. They are given various names as per the type of structural member construction like slab framework, beam framework, column framework etc. to use in beams and columns.

The harden process requires time and includes an expenditure up to 20 to 25% of the cost of the structure or more than that; the temporary design structures are made of economic expenditure.

While the removing process of the framework is known as stripping that can also be used later; the unusable are called panel forms and the non-useable are called stationary forms. The most commonly used material for formwork is Timber.

This article is a short knowledge for people about formwork, the different types of formwork and the basic needs to complete a formwork properly. Formwork comes in several types such as:

1. Traditional timber framework
2. Engineering Formwork System
3. Re-usable plastic formwork
4. Permanent Insulated Formwork systems
5. Stay-In-Place structural formwork systems
6. Flexible formwork


Requirements of Formwork: It is stated above that framework varies as per material and material is the main ingredient for every framework, but for any kind of chosen material the three common principles of quality, safety and economy should be the same. While the quality of material ensures safety and also considerably helps to achieve the economy; any kind of failure in framework can cause of the loss of life and tragic financial loss. To avoid the loss the following guidelines should be followed from start to framing materials and for the associated components:

1. Strength: The strength of material must be sufficient to strong the forces expected and this is the important for both the structural design and safety aspect.
2. Stiffness: the structural movement under load should be small and sure; these deformities and separations are the necessary part of the whole deviations in the formed concrete surface. While planning the formwork system, a designer must take decisions upon the total acceptable variations and the extend workmanship errors and structural deformity. The material stiffness and the workmanship accuracy must be stable to ensure the stability of the total deviations to keep the tolerances.

3. Impact Resistance: The forms are made to make sure that the damaged form that is useless does not make falling debris and to make sure this important safety quality, materials displaying ductile failure are far above than those fail in a hasty and brittle manner.
4. Durability: The framework must be durable either it will affect the economy and the achievement quality concrete product at every reuse of the formwork; formwork is always pre made and used out in the open. When the matter of re-uses came the thing is dependable on its reaction of materials and components with weather and the framing, components and formface materials should be strong in any environment. Material durability is important for both the achievement of good quality concrete surface finishes and safe formwork structures.

5. Weight: While the assembling process in formwork, both the members and components are shifted into position by hand that will be applicable after the complete framework which are heavy and need a crane to do the shifting work. So the framing members, formwork components and formface materials must be keep in size so that they must be carried and lifted by the worker or the crane etc.
6. Accuracy: Every construction process is dependable on a lot of money so the work of lifting and cutting of materials must be done within a minimum amount of money and consistency of size of materials, plywood sheets and framing members is very important.
7. Compatibility: The framework materials should be fitted with either the fluid concrete or the strong concrete and at the formface, the elements of the form materials must not react with the wet cement or concrete.
8. Insulation: Some materials react with the environment if it’s become extra hot or cold, so the protection for the materials is must; if the mix becomes frozen and the chemical bondage damages then the concrete has to be placed at low temperatures, heat the mixing water etc. The placing of the fluid concrete for all forms can cause some damage with the crushed rock aggregate and the proper steps has to be taken to stop it.


The Basic Requirements of Formwork


Read more

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, February 5, 2018

Why RC Structural Slabs and Beams are provided in plinth level

Given below, the detailed information on the importance of arranging RC structural slabs and beams at plinth level (GF-Finished Floor Level).

Wherever low/poor bearing capacity soils met with, the Architects and also certain Builders think and believe that If the bearing strength of soils become weak or low, RC Structural slabs & Beams may be arranged at plinth level (GF-Finished floor level) with the purpose of preventing settlement of foundation and subsequent development of cracks in walls.

By applying your own experience and expertise in foundation structure, it is possible to have clear idea on the behavior of weak bearing soil if loaded heavily. The foundation cost is raised by 50% with the inclusion of the cost of setting up RC Structural Slabs & Beams.

But the provision of RC structural slabs and Beams at plinth level may not be considered as useful solution to get rid of foundation settlement and subsequent cracks. Rather it will be treated as extra expenses that is incurred on the construction of structure.

It is recommended to apply the following measures to resist the settlement of foundation systems and wall cracks efficiently.

The foundation soil at a depth of 00 m to 2.70m (if it belongs to a weak bearing soil like soft/medium clay) should be artificially reinforced with Geogrids/Geotex layers supported with Quarry dust:Gravel Mix 1:3 or cement.

Quarry dust 1:10 mix in 4 or 5 layers of 200 mm thick will enhance the SBC of soil at 2.00m/1.80m level to 200kN/m2 from 100kN/m2.

Arrange an extra layer of Geogrid/Geotex over and then apply the PCC 1:5:10 for 100 mm. Over which the foundation system should be provided as designed-combined strip Raft/combined/isolated footings as per situation. Inspite, under reamed piles with pile cap may be arranged directly.

To get more details, go through the following link onlinecivilforum.com
Why RC Structural Slabs and Beams are provided in plinth level

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, January 3, 2018

Detail lists of useful construction tools

Given below, the detailed lists of various useful construction tools and their applications :-

Hoe – It is effective for digging and arranging concrete, cement mortar in head pan. Hoe is also useful for excavating the soil but here the metal plate is set with acute angle to the wooden handle.

Head Pan – It is utilized to transmit materials. Head pan is built with iron to uprise the excavated soil or cement or concrete to the construction site etc. it is mostly found in construction sites.

Masonry trowel – The objective of this tool is to organize cement mortar. It refers to a hand trowel that is applied in brickwork or stonework for the purpose of leveling, dispersion and shaping mortar or concrete.

Measurement Tape – It is employed to examine the thickness, length, widths of masonry walls, foundation beds, excavated trenches etc.

Plumb Bob - It is applicable for verifying the vertical alignment of the structures. It comprises of a solid metal bob attached with the end of a thread. It can also be applied in surveying to level the instrument position.

Wheel Barrow – It is useful for carrying out cement mortar or any materials. Often, it is utilized to estimate the quantities of materials for site level concrete mixing.

Concrete Mixer – It is a machine that is used for blending the concrete perfectly with water, fine aggregate, coarse aggregate and cement at construction site.

Vibrator - It is utilized to vibrate the concrete when pouring is started. For the purpose of workability, water is added to concrete. To get rid of that, vibrators are applied.

Bump Cutter/Screed – The objective of this tool is to level fresh concrete surface particularly in slab concrete.


Wooden Float/wooden rendering float - This tool is useful for providing a flat finish to the plastered area.
Crow Bar - This tool is found in formwork to eliminate nails from boards. Crow bar is also applied for digging the ground and taking out the roots of trees in the ground, nails etc.
Framing Square - This tool is mostly found in Brickwork, Plastering to verify exact angle.
Line Level - This tool is required to verify horizontal level in brickwork, plastering , flooring and tile works.
Flat Pry Bar - This tool is found in shuttering and often utilized to modify the column formwork to align.
Digging bar - This tool is used to divide and unloose the compacted / hard surface area. Digging bar refers to a solid metal rod having pin shape at the bottom. It is also utilized to dig the hard surfaces of ground.
For more information, go through the following link www.civilology.com
Detail lists of useful construction tools

~~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~~