To find out the exact quantities of concrete for
a construction project is very crucial. Given below, some useful tips for
computing the quantities of concrete mix for any construction project.
How to work out the amount of concrete necessary
for Slabs(along with odd shapes)
Rule of thumb: Include 1/4" to the density
of your slab for your slab concrete budget. It supposes that the job is
uniformly graded to the exact depth, and the grade is properly compacted.
While examining your grade, if it is found that
one spot is 4" and other spots are 4.5" to 5" then it is
recommended ion to settle the grade for both the job quality and your concrete
budget.
Odd shapes: Convert odd shapes into rectangles
and odd shapes can be located easily.
Build driveway 14' x 20' and your estimate will
be perfect. It will be done in this way - The driveway is 16' at the top and
12' at the bottom. Throughout the center the width averages 14'.
Working out the Amount of Concrete Essential For
Footings
Footings will seldom pursue the drawing
accurately. In the soil where there are lots of gravels, the footings may fall
down if big rocks are excavated.
It is assumed as a 12"*12" footing, but
check how the left side of the footing has fallen down. Compute the exact width.
The digging is too deep by the excavator, or
there may be raining and the digging for footings should be deeper to get to
solid soil. Therefore, it is vatal to examine different types of spots on your
footing and obtain an average size. Then with the help of a calculator, works
out the required amount of concrete.
House slabs on grade that are 8" out of
grade containing a 4" slab also arranged some of the footing over the
grade too.
This 12" x 12" footing should be
computed as 12" x 16" so the footing is built to go over grade to
attain the 4" slab thickness.
To make calculation online, click on the
following link www.concretenetwork.com