There are many
methods used for calculating quantities of materials. Which one goes with your
plan depends on the design and shape of the building. Each method is
characteristically different from other.
Calculation of
quantities of material needs a proper technical understanding of materials and
construction. The five major methods are described here for you and they come
up with the right measurement of materials you need.
1. Centre Line
Method: Centre line method is applicable to the square building with
symmetrical offsets. To calculate the quantities of materials, you need to
multiply the total centre line length with breadth and depth of the
construction.
The centre line
length will be reduced by half of breadth of every junction where the main wall
is joined with the cross walls, partitions or verandah. The junctions must be
taken into consideration while calculating the centre line length of a wall.
The quantity estimation brought out by this method is accurate and fast.
2. Crossing
method: Crossing method is designed for calculating materials needed for
masonry walls. In this method, the lengths and breadths of walls at plinth
level (the base on which a column is raised) are included. The internal
dimension of the room and the thickness of the walls are also important to
calculate the quantities. Symmetrical offsets should be counted as they play a
major role in the calculation of quantity of materials.
3. Out to out
and in to in method: This method follows P.W.D system for computing materials
and this seems to be the most accurate method among all.
4. Bay method:
This bay method is applicable in garages, factory, and railway platform where
identical structures are visible. Bay in a construction term means a
compartment of a building. The cost of one room is calculated first and it is
multiplied by the number of bays.
5. Service unit
method: The term service unit method is designed for building with identical
rooms. This method is applicable in the construction of college, hospital,
cinemas, prison, and more. When it is a construction of a hospital, the service
unit will be a bed. Likewise, for cinema/stadium, it is seats.
Calculating
quantities of materials follow the above-mentioned methods. Each of which shows
a different perspective of calculation and they are also concentrated on
different construction types.
~~~~~~~~~~~~~~~~~~~~~~