Slip forming alias continuous poured,
continuously formed, or slipform construction stand for a construction process
in which concrete is poured into a constantly moving form. Slip forming is
employed for high structures (like bridges, towers, buildings, and dams), as
well as horizontal structures, like roadways.
Under the slipforming method, the
formwork is shifted ceaselessly in sync with the concreting method in a 24-hour
operation. The formwork along with the working platform and the hanging
scaffold lifted inwardly or on both sides, is attached to the jacking rods in
the center of the wall. The lifting jack that runs with hydraulic oil increases
the formwork by 15 to 30 cm per hour on the basis of the temperature. The
jacking rods are set in pipe sleeves at the top and are supported with the
concrete that is already solidified. The rods and sleeves are also expanded
endlessly. Mainly, the specialist contractors perform these work completely.
Slipforming is a rapid and well-organized method. The
method is specifically applicable for simple, stable ground plans and following
high structures:
High bay
warehouses, silos§
Tower and chimney structures§
Shaft structures§
Tower and chimney structures§
Shaft structures§
As the height of the formwork is normally around
1.20 m and per hour production rate is 20 to 30 cm, the concrete beneath is 4–6
hours old and should be sufficiently rigid to carry its own weight (green
strength). Though, it should not have arranged adequately for some of it to fix
to the rising formwork (“plucking”). The main purpose of slipforming devoid of
any issue is to start concreting all areas at the same level all together, and
then perform the setting of these layers all at once. So, the temperature plays
an important role together with the need for the constantly optimum w/c ratio.
Composition:
Aggregate 0–32 mm, or 0–16 mm for close reinforcement§
Despite the fact that slipformed concrete is primarily crane handled concrete, the fines content should be as for pumped concrete§
Cement Min 300 kg/m³§
CEM I 42.5 for close reinforcement and large dimensions, CEM I 52.5 for smaller dimensions (towers, chimneys)§
Aggregate 0–32 mm, or 0–16 mm for close reinforcement§
Despite the fact that slipformed concrete is primarily crane handled concrete, the fines content should be as for pumped concrete§
Cement Min 300 kg/m³§
CEM I 42.5 for close reinforcement and large dimensions, CEM I 52.5 for smaller dimensions (towers, chimneys)§
Workability: The best workability is achieved if a
stiff plastic concrete contains a flow diameter of 35–40 cm and a low water
content. Note particularly that a wall thickness below 14 cm can create a issue
(plucking, anchorage of jacking rods etc.). The newly struck surfaces should be
safeguarded as much as possible against wind, sunlight etc.