This is an estimating sheet which is separated into: labour, material, non-material, sub contractor, sub total, burden, sales tax, margin, grand total and cost/sq ft.
General contractors, sub contractors, developers and architects will be helpful by this estimation sheet.
At the extreme left of the sheet, there is ITEM under which General Requirment, site work, Concrete, Masonry, Steel, Carpentary-framing, Tharmal Moisture Protection, doors and finishing.
Rows for mechanical and electrical are separately segregated.
At the bottom, there are overhear and profit, builders risk, contingency and permit are to be put. And last but not the least is grand total.
~~~~~~~~~~~~~~~~~~~