adsense analytic

Showing posts with label material takeoff. Show all posts
Showing posts with label material takeoff. Show all posts

Saturday, June 7, 2014

Senior Estimator in Bellevue

S.D. Deacon is looking for a senior level Estimator with experience in conceptual estimates, negotiated work, competitive bidding, etc. Experience should be on projects valued from $5 to $50 million in commercial new construction and renovations.

This position requires thorough knowledge of all construction divisions and the ability to generate accurate scope and pricing based on limited information. The ability to manage a workload of multiple estimates and participation in GC/subcontractor project walks is required.

highly motivated, with the ability operate efficiently in a fast-paced environment. Working knowledge of Microsoft Word, Excel, and Outlook and scheduling software knowledge optimal. The best candidates will be detailed and organized team players with demonstrated delivery in high pressure situations. Excellent growth potential & benefits.

  • Bachelor’s Degree (Architectural, Engineering, Construction Management and/or business preferred).
  • Strong Conceptual Estimating and Pre-Construction background would be a huge plus.
  • Experience bidding projects in the $5-$100Mil range.
  • Proficient in Excel, On-Screen Takeoff, Bluebeam, SmartBid or similar bid management software.

Senior Estimator in Bellevue 

~~~~~~~~~~~~~~~~~
Publsihed By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~
 

Wednesday, November 9, 2011

Materials Estimator in Builder Estimating Software


Materials estimators come in many different shapes and sizes, everything from the old salty hand to six-figure software programs. However, right in the middle is one of the best options, construction Takeoff and Estimating Software. Material takeoffs can be done with software in one-tenth the time it takes to do the same work by hand with highlighter and calculator.

Construction Estimating Techniques and Procedures applied in construction estimating materials, labor, plant and time is immensely useful in planning and execution of any work. The following are formulas to calculate the amount of material you all need for a variety of building projects.

Concrete: Width x Length x Height, divided by 27 = number of yards of concrete needed
Foundation Masonry Block: 8" high / 16" long / 3/8" mortar normal joint height.
Roofing: Width x length, divided by 100 = number of squares of shingles needed
Siding: Width x Height, divided by 100 Square Feet = number of squares of siding needed
Wood Siding: Width of board minus distance of lapping = coverage of wood siding per board
Brick: 7 bricks = one square feet of coverage Width of area to be covered x height of area to be covered, divided by 7 = number of bricks needed.

Builder Estimating Software creates estimates and bill of quantities. Construction estimating, bill of quantities,  takeoff and digitizing requirements.
Cost of materials is probably the most obvious item you have to consider in your production costs which are the materials you use to make your products. Estimating software is a simple user-friendly program for residential construction building cost estimating software helps make material costing faster, easier, and more accurate.


Posted by Manoj Kumar Singh
Web Developer

Friday, November 4, 2011

Material Take Off with Revit


One of the larger features that was included with the Revit 9 release was material take off's. This feature allows us to easily schedule the type, quantity, etc. of materials that are used in our Revit designs. Needless to say, this is a huge part of green building. With this information we can also begin cost analysis & estimating directly from Revit.

Material takeoff schedules list the sub-components or materials of any Revit Architecture family. Material takeoffs are detailed reports of the materials you will need to purchase for each project, as well as the total quantities of those materials. Material takeoff schedules have all the functionality and characteristics of other schedule views, but they allow you to show more detail about the assembly of a component.

To more specific number for scheduling for Material takeoff:
  • Since “Volume” is calculated, first create a project parameter for materials called "Thickness".  Set type to “Length”.
  • Next add a “Calculated Value” column in the schedule to divide the “Material: Volume” parameter by the “Material: Thickness” parameter [which would be entered manually for each material in the project] once you add that parameter to the schedule.  Calculated value column should be set to “Area”.
  • The “Calculated Value” column will display a more specific number for scheduling.

Integrated materials takeoffs can increase your productivity, and save you valuable time and money.

- Soft Costs
- Site Costs - landscaping)
- Foundation Materials
- Windows and Doors
- Electric, HVAC & Plumbing
- Interior Finish Materials - dry wall, trim, floor and labor
- Cabinets - kitchen, vanities & counter tops)

Posted by Manoj Kumar Singh
Web Developer
Global Associates
A pioneer company in 
construction estimating
Join our estimating forum

Tuesday, August 2, 2011

How to prepare a bid estimate to win a project

A bid process is required to award the most jobs in construction industry. In a bidding contest the lowest bidder will be awarded the contract. Estimating a construction bid involve some knowledge of the building process.

The bid estimate is specific to the project conditions illustrated in the plans and specifications. The bid estimate is required by contractors and subcontractors for bidding purposes or the owner to appraise bids.

In order to prepare an accurate construction bid, the most current drawings, project specifications and copies of any addenda or change bulletins that have been issued are required. The company who is calling for the bid should render all of these documents. In case the drawings are submitted from a plan room, the addenda and bidding requirements should be checked properly.

Review the drawing and floor plans. Then review the title and symbols pages for any general project requirements.

Review the project specifications for getting most sets of construction documents. Read the section related with your trade and read the prelim section featuring general project conditions.

Measure material quantity by executing a material takeoff. As for instance, an electrical contractor should take into consideration the receptacles, switches, junction boxes, light fixtures, and length of wires and conduits along with panels, transformers and any electrical connections for equipment or mechanical work. These estimates will sum up the total material price.

Work out the labor costs. Find out the time frame for completion of the job and multiply this number of hours with the average wage plus any labor burden to ascertain the total labor costs.

Put material and labor costs together and comprise any special fees like permits, wage scale, bonds, insurance premiums or other costs. Multiply the total dollar figure with an appropriate percentage to contain overhead and profit.

Finally prepare your bid form putting price, complete scope of work and the name of the project.
In case the project is different from typical designs, the contractor should evaluate the actual cost of construction by taking the actual construction procedures to be used and the related costs.

Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Wednesday, October 6, 2010

How to make cost estimation to Pour Concrete

In order to refinish a garage floor, make a garden pavement, build your own paver stones etc., one has to find out the estimated cost of pouring concrete before starting a new project

In order to figure out the cost one has to initially compute the length and width of the area to be paved with concrete. Then resolve the thickness of the concrete to obtain the total volume of required concrete. As for instance 4 inches of concrete will be required for making a 10-foot-by-2-foot walkway.

If you put the above figures in a Concrete Calculator then it will show that for making the 10-foot-by-2-foot walkway with 4 inches thickness 0.25 cubic yards of concrete will be required. One has to buy 23 40-lb. bags or 15 60-lb. bags of concrete for this.

If you hire a concrete delivery truck, you have to pay extra charges for pre-mixed concrete deliveries and labor time along with pre-mixed concrete price.

You also have to incur expenses for other materials like gravel substrate for placing below the concrete, sand and gravel for mixing with the concrete, rebar for holding up the concrete, a squeegee to spread it, a trowel to joint it and a wheelbarrow and spade to mix it. You'll also require pre-made concrete forms and a concrete release spray for easy elimination of the forms as soon as the concrete dries. As the concrete cures you must cover it with a plastic tarp.

You also have to take into consideration for ancillary materials from hardware’s store.

In case of applying bagged concrete, obtain the cost per bag then multiply by the number of bags for determining the total concrete cost.

Also count the cost of the supporting materials. Then include this either with the cost of the pre-mixed concrete or the bagged concrete. Finally the overall cost of your concrete job will be determined.

Posted by
Rajib Dey
for construction estimating service

Thursday, September 16, 2010

Construction Estimating Courses & Training Classes

Construction courses & Training classes
There are so many renowned construction companies who provide online and offline training programs for students, engineers and construction professional. These companies also arrange customized training as per your requirements. These courses come up with practical examples and exercises and provide individual attention. The courses are especially helpful for those students who are studying for a Contractor’s License.
The students and other construction professionals will get the ability to develop a concrete estimating practice with accuracy and confidence to enhance efficiency and productivity for completing a project successfully.

Given below the examples of some noted construction companies and their detailed training schedules.
US Cost
http://www.uscost.com/training.asp
Construction Estimating Institute
http://www.estimating.org/courses.php?course=14
http://www.floridacontractorexam.org/
Florida Department Of Transportation
http://www.dot.state.fl.us/projectmanagementoffice/PETraining/default.shtm
Roctek International
http://www.roctek.com/suppServices.htm
Builders Estimating & Exam School
http://www.buildersestimatingschool.com/construction.htm
The Edge
http://www.buildersestimatingschool.com/construction.htm

Posted by RAJIB DEY

for www.quantity-takeoff.com