adsense analytic

Showing posts with label labour. Show all posts
Showing posts with label labour. Show all posts

Thursday, January 29, 2015

Estimate Spreadsheet - Live Demo

This is an excellent video published by jobleads. Construction Estimating made easy this video will show you just how easy an Estimating Spreadsheet is to use.

This estimate spreadsheet also includes drywall, piping, labor, risk cost and summation of all the estimated expenditure.

Watch the Video:


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Tuesday, January 27, 2015

Roofing Cost Estimator - Roofing Cost Calculator

It generally gives the updated estimate of roofing. It is equally applicable in new home and remodeling. Nationally acclaimed author and home builder Carl Heldmann says that it is costly affairs and depends on roofingmaterials, roof pitch, and labor.

It is measured in square foot. A square is basically to cover 100 square feet (10 feet X 10 feet). But it is not simple. Rather it is tough to those who don’t know geometry well.

Heldmann advises to hire good roofing contractors and let himestimate. Now you can make your own calculation and match it with for comprehending the disparity.

Weight: Sometime it is lightweight but sometime it is heavy, when quality weight increases.

Pitch: It is seen that the roofing installation labor boosts as the pitch of the roof increases.
The selling price:

Heldmann’s opinion: roof pitch is handy to restore roof costs and new home roof costs more than anything else. Roof pitch is pointed to by a number over a number.

The most common are 3/12, 4/12, 5/12, 6/12 and so on. The higher the top number, the steeper the pitch.

This terminology would be: The pitch of a roof = the rise of the roof in inches over (/) each foot of span (horizontal travel).

Some Important Point to be remembered:-
  • A 4/12 pitch, or a 4 over 12 pitch, would mean that there is a rise of 4 inches for every foot measured from the outside edge of the roof towards the center of the roof (horizontal span).
  • It is interesting to note that the square feet of shingles (squares) required increases dramatically as the pitch increases. A 12/12 pitch contains twice as much shingle area as a 6/12 pitched roof!
  • Roofing contractors charge according to the shingle weight and the roof pitch because the steeper the pitch and the heavier the shingle, the harder their job is.
  • I think roof design is the most important component of home design.
  • I think that heavier shingles and steeper pitches look great and add curb appeal... if you can afford it.
Warranties:-
  • Asphalt shingles and fiberglass shingles are warranted according to their weight.
  • The least expensive lighter weight shingles carry a 15 year warranty while the heavier more expensive shingles are warranted for up to 25 years.
  • Chimneys should be built (finished) before the area surrounding the chimney is shingled.
  • Dormers are not only good-looking; they assist in adding cheap living space.
  • But dormers are a bit luxurious to build and a steep pitched roof is required to gain that extra living area. But I found that the trade-off for that extra room is worth it.
Roofing Cost Estimator

Image Courtesy: ozgrid.com

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Monday, January 19, 2015

Bill of Quantity for Construction

It is actually an itemized list of materials, parts, and labour (with their costs) required to construct, maintain, or repair a specific structure.

bill of quantities (BOQ) is a text used in tendering process in the building construction industry. Here the materials, parts, and labour and other things are (and their costs) are listed.

It also (preferably) particulars the terms and conditions of the construction or patch up contract and itemizes all work to enable acontractor to price the work for which he or she is bidding.

It is usually arranged by surveyors and building estimators. The bill quantity generally made by a ‘taking of. The process of estimation is making: Architects, Structural Engineers, and other building consultants drawings.

These have been used to construct a cost estimate such as measuring meters of walls and roofs, the numbers of doors and windows, and systems as heating, plumbing and electrics.

Parallel work is then brought together under one thing, which is a process known as abstracting.

There is a Contingency sum is an item found within a Bill of quantities (BoQ). The item refers to hidden cost likely to be inviting during the contract. A Bill of Quantities considers all costs and is seen-through in relations to all costs.


Bill of Quantity for Construction
Image Courtesy: http://images.1233.tw/
~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~


Wednesday, December 24, 2014

Make your material control system superior with Jovix

Birmingham based Atlas RFID Solutions introduced a newconstruction product called Jovix™.

This newest construction technology helps construction professionals to trace materials quickly as well as productivity of direct labor and minimize the usage of material recorders.

The construction professionals will get a clear idea that their construction project gets the proper materials at the right time and in the right condition. So Jovix will facilitate the construction professionals to combat with the supplementary material control issues on the industrial construction projects.

Jovix is compatible with mobile inspections and precautionary maintenance. Besides, it can deal with and resolve oversupply, shortfall, and damage issues, as well as foresee the accessibility of materials in future through supply and demand calculation.

The latest version of Jovix (2014.2) comes with some advanced features like importing drawing data fromengineering tools and inserting and controlling attachments inside the application. Besides, the mobile tablet interface is upgraded to make it more reliable and accessible by expanding material control powers to the jobsite and keeping aside the labor-intensive, paper-based practices from the jobsite.

With Jovix, the users can undertake anticipatory maintenance activities through the tablet to get incessant clarity and control all through the whole material lifecycle ranging from fabrication through installation.

Jovix enhances project efficiencies on the whole with the positive material by providing unprecedented access to executable, up-to-date toward the accessibility, status, and location of materials in the global supply chain.

In order to get the product, visit http://atlasrfid.com



~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~