Some useful construction tips to calculate excavation of trenches

This construction video provides step-by-step instructions on how to measure excavation and backfill concerning trenches.

Trench stands for an extended excavation that is separated from pits or basements. A footing is a good instance of the trench.

In order to find out the volume of excavation for a simple footing, the following formula is used :-

CL x W x D = Cu.Ft. of Excavation

If you want to change to cubic yards, divide the results by 27

It becomes very difficult while going to make calculation for a trench that includes working spaces and sloped sides. The following formula is used for this purpose.

CL x AD x AW = Cu.Ft. of Excavation


~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~

Thursday, November 24, 2016

Some useful construction tips for becoming a successful rebar checker

While developing a big project, there should be a perfect technical engineering perception and cautious observation. Besides, other crucial examinations, Reinforced Cement Concrete should be verified for rebar toward the supplied construction drawings / shop drawings or technical specifications.

It should be remembered that the obstacle and cost associated with this activity may cause imperfection from the contractors end and it should be resolved / settled by a well-known consulting firm assigning on the inspection of execution.

One should have sound knowledge and well versed with the binding method of the steel rebar. Given below, some useful construction tips suggested by the top peers:-

a. Initially, one should have good knowledge on how to study a rebar drawing as well as communicate with it in the jobsite. In order to become a proficient rebar checker, you should have the capability to read drawing.

b. Carry a measuring tape with yourself so that you can verify the spacing and the splice length or development length.

c. Use a plastic glove, when checking the rebars as holding steel with bare hands may cause harm to the skin of of your body.

d. Should be familiar with the physical features of the construction component i.e. installing the drainage pipe or electrical conduit or replacing water stopper and any other pipes / embedded item.

e. Use vernier caliper to verify rebar diameter, rebar spacing, rebar development length, lap / splice length, alignment. Other important things range from no sag or buckling in the bars, perfectly fixed & tightened couplers, rust free bars, verifying clear cover, counting no of bars as per drawing specifications and must not be below or over 2 bars.

f. As a newbie in this field, try to keep in touch with contractor’s foreman or site engineer as they know well how to arrange these bars.

g. You should have good knowledge concerning the steel quality tests like tensile strength check or torsion failure strength or coupler tension strength check etc. Make sure that the steel are used after proper verification and poor quality steels are used.

h. Because of rough field conditions and difficultly in setting up / fixing of rebars, the proper design can’t be created. But you must be very careful about it as improper design may lead to collapse of a building.

i. One of the very crucial factors is to retain the exact orientation of bars like main rebars should be always arranged under the distribution or temperature rebars. It can be verified from the drawings submitted to you.


Some useful construction tips for becoming a successful rebar checker

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Friday, August 5, 2016

How To Lay Brick and Mix Cement Efficiently to Develop A Brick Wall

Get some useful construction tips on how to lay bricks and mix cement for a brickwall. To start the construction work from scratch, you require some good construction tools. Given below the detailed lists of construction tools :
• A brick trowel
• A spirit level
• A jointing bar
• A tape measure
• Line and pins
• A soft brush


Next you should learn how to mix cement.
Mixing cement is the most vital part of the construction processes. Ensure that you don't keep it too wet or too dry for utilization. The work must be based on a ratio basis. You can mix in the ratio of 4:1 (4 part sand to 1 part water) or 3:1 (3 part sand to 1 part water). But remember, once you set the ratio, it should be maintained until the work is completed otherwise the mortar will be drying in various shades./p>
If you can arrange a cement mixer then the mixing can be done smoothly. To start the mixing process, you will require the following items:
• Building Sand
• Cement
• Water
• Feb (Mortar additive)


Given below the stepwise processes for mixing mortar in a cement mixer:
• Load a bucket with water and include two sachets of feb. Use approximately a quarter of it into the mixer and turn it on.

• Keep the water and the feb to rotate for about 30 secs. Then include your first 3 shovels of sand (4 if the ratio is 4:1) Keep it to blend with the water and feb for some time.

• When the sand has developed a steady mixture (apply more water if it hasn't) and then include your shovel containing full of cement. Let it to be blended for some time and recur the step unless your mixer is packed. Include more water if required.‪


N.B.: Do not include water excessively. Initially, keep close eye on mixing process. It may appear too rigid but it frequently requires time to spin. If it still isn't appearing to be perfect then include little water at a time.
Mixing manually
• Ensure you contain an expansive wooden board for mixing. You should require it.
• Tip your 3 sand and 1 cement onto the board and blend simultaneously dry with the shovel.
• Make a hole in the middle of your sand so it appears to be a volcano.
• Add the water and feb from the bucket and blend it completely again.
• Recur these methods unless you obtain as much Mortar as per your requirement.

Types of Engineering Surveying

To go through the complete article, visit the following link dengarden.com

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Wednesday, June 15, 2016

How To Perfectly Lay Blocks For A Brick Wall

This construction video will introduce you to some useful construction tips on how to lay 12 inch block perfectly for a brick wall.

There are various types of concrete blocks available for present construction industries. Generally standard 8" units is widely used that can make the greater part of the foundation. Other types range from single and double corner units, which offer a smooth square or rounded corner. There are also jamb blocks which can be used for developing a doorway.

Sash blocks are applied if it is required to form casement windows with an opening. Place header blocks at the top of a wall to provide space for roof supports or other construction supports.

If required, the specialty blocks can also be purchase. Alternatively your building blocks can also be customized to give a personal touch to your project.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Monday, June 13, 2016

How To Set Up Wood Fence With Posts And Pickets

This construction video provides some useful construction tips for setting up wood fence along with posts and pickets.

At first dig holes for the component fence, then arrange the posts. Initially compute the posts and trim as per length. Prior to placing the posts, include gravel for drainage. Adheres to local building codes to get the exact amount required. Now organize the posts in proper position, insert concrete and water. Fill to roughly 2'' from the surface.

As soon as the concrete is dried, and the posts are securely in position, set the stringers or rails. Arrange one rail for about each 2' of post height. Affix the rails to the outer side of the posts on the bottom, middle and top by screws. Ensure that the rails are leveled with your posts.

Once the rails are installed, finally set up the pickets. Affix the boards through a nail gun to every rail. The pickets should remain right next to each other. Verify to ensure that the pickets are level. For edges, overlay the pickets for a clear and uniform corner.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Monday, June 6, 2016

How To Resolve Wood Fencing Damage Due To Rot

The following construction video offers some good construction tips on management of wood fence construction and how proper maintenance of wood fence can significantly reduces the costs for home repair. The video also highlights how wood fence construction is affected with rot due to moisture & water and collapsed easily. If you can sort out these problems easily, the life of your wood fence will be expanded greatly. Other reasons for damage may range from severe weather (like rainfall, snowstorms, heavy wind, or salt air), damage from vehicles or devastation, and insect incursion.
Some useful tips for installation
If you are going to set up a wood fence, ensure that the lumber is sufficiently dried to prevent warping. Apply pressure-treated wood (particularly for posts, which are uncovered to high levels of moisture in the soil) or naturally moisture-defiant hardwoods like cedar. A special finish, like stain or paint, will be essential to safeguard the above-ground structure. Refrain from using galvanized nails if you’re close on a body of salt water. Set up fence posts not less than 3 feet deep, with tops cut at an angle, to facilitate them to cast off precipitation.

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Thursday, January 28, 2016

How to renovate a bathroom by prepping the subfloor properly

Go through the following construction video to get some useful construction tips for renovating a bathroom by installing new tile in the bathroom. Before doing that you have to learn how to take out old tile floor.


Here the most crucial part is to prep the subfloor. You will learn how to set up a waterproof tile membrane over the subfloor. While prepping the subfloor, the proper process should be undertaken.



To obtain complete information on the above, visit http://low.es/1icES2j

How to renovate a bathroom by prepping the subfloor properly

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Thursday, November 19, 2015

Strength of Doubly Reinforced Concrete Beam (compression steel not yielding)

Some useful construction tips to calculate the nominal flexural strength Mn concerning the reinforced concreterectangular section. It is illustrated in figure 9-3(a).

The provided section is reinforced twice with steel in tension and compression zone of the section. The guidelines of ACI-318 is followed for calculating the nominal flexural strength Mn. The highest value of applicable strain at the utmost concrete fiber is supposed to be 0.003.

For fc' grerater than 4000 psi the value of ß1 is calculated as given below;
ß1 = 0.85 - 0.05 {( fc' -4000)/1000} = 0.8
Assume that the compression steel has yielded when the strength is reached (strain in concrete is 0.003).


Given that tension steel consists of 4 bars of #10 (dia 1.27 in.).
Area of one bar of #10 = 1.27 in2.
As = 4-#10 bars. = 4 (1.27) = 5.08 in2.


Area of compression steel , As' = 2-#7 = 2(0.6) = 1.2 in2. The internal forces acting on the section shown in figure 9-3(c) are calculated as given below;
Cc = 0.85 fc' ba = 0.85 (5) (14) a = 59.5 a 
Cs = (fs' - 0.85 fc') As' = (60 - 0.85*5) 1.2 = 66.9 kips
T = As fy = (5.08) (60) = 304.8 kips


Applying static equilibrium, we get Cc + Cs = T;
59.5 a + 66.9 = 304.8
therefore depth of stress block, a = (304.8- 66.9)/59.5 = 3.998 in Depth of neutral axis x = a / ÃŸ1 = 3.998/0.8 = 4.997 in



Strength of Doubly Reinforced Concrete Beam

Strength of Doubly Reinforced Concrete Beam

~~~~~~~~~~~~~~~~~~~~~~
Published By