adsense analytic

Showing posts with label construction jobs. Show all posts
Showing posts with label construction jobs. Show all posts

Tuesday, August 7, 2018

Details of Cast in Situ Concrete Piles and their advantages

Cast In Situ belongs to a construction item or structural member similar to a beam or in this case a Pile that should be built up, assembled or poured at site instead of prefabrication in a factory. Normally, in cast in place or cast in situ construction, concrete is delivered from a batch plant to site where it is poured and compressed into the formwork that is fixed in required shape and dimensions at site.

Cast in situ or cast-in-place piles are cast in position inside the ground; generally in such type of piles, drilling of necessary diameter and depth into the ground is done with an auger drilling device or a drill bit.

There is a helical screw blade generally known as a “fighting blade” inside the device that functions as a screw conveyor to eliminate the drilled out material. Besides, auger drilling an old method known as percussion drilling is also applied for excavating the hole. Under this method, a heavy cutting or hammering bit affixed to a roper or cable is lowered in the open hole or inside a temporary casing.

After entering deep into the ground, a temporary steel casing is lowered in the borehole to safeguard loose soil from dropping in the borehole.

The verticality of the casing should be examined precisely prior to start. Once the optimal depth is attained, the reinforcement cage with vertical rebars and stiffeners is lowered within the borehole, and the upper part is hanged at the top. The concreting is generally performed with Tremie method of concrete piling.

There are normally 6 types of cast in situ piles as below:-

1. Simplex Pile, 2. Franki Pile, 3. Vibro Pile, 4. Vibro Expanded Pile, 5. Raymond Pile, 6. Mac Arthur Pedestal Pipe

Benefits of Cast In Situ Concrete Piles: The cast in situ piles are set up with pre-excavation and reduce the vibration because of driving as in case of driven piles.

In housing area, sound pollution may occur if the piles are entered by hammering. To get rid of this issue, situ piling is suitable in such areas.

For water logged area, cast in situ piling with permanent casing is very effective.

The skin friction resistance with the ground is fully used in cast in situ piles throughout the design phases that is not recommended in case of driven piles where only the end bearing is applied.

Normally, there is no need of any foreign materials and tools and the original equipments and materials will meet the requirements of a project, as a result the cast-in-situ piles become as a cost-effective and adjustable type of pile foundation.

Precast piles should be designed to satisfy the handling and driving stresses thus enhancing the essential reinforcement that does not happen in the case of cast in situ piles and therefore, the amount of necessary reinforcement is minimized.

Cast in situ piles are attached over the ground with a pile cap that applies a monolithic approach. The top ground is excavated up to pile cut off level from where the slushy low quality concrete is eliminated with hand hilty to retain developed rebars into the pile cap.

Because of this monolithic connection, cast in situ pile provides good resistance against the earthquake and wind forces.

As soon as the piles are casted, no maintenance is required.

Since the materials and machinery applied are obtained from the local community, local contractors can perform the job and not any skilled labor is required for cast in situ piles.

No serious consideration should be provided for joints in cast in situ piles with regards to precast driven piles.

Details of Cast in Situ Concrete Piles and their advantages

Read more

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, June 11, 2018

Some crucial factors a civil engineer should follow

This construction video tutorial sifts through some vital factors which should be abided by a civil engineer to apply them in the jobsite.
The factors are discussed in below :-
Compressive strength of bricks should be 3.5 N/mm2
Water immersion of bricks should not surpass 15%
Free fall of concrete is permissible up to 1.50 m
Lowest thickness of slab is 125 mm
Longitudinal reinforcement should not be under 0.8% and over 6% of gross C/S
Lowest bars required for square column is 4 Nos and for circular column is 6 Nos
If the bars contain diameter over 36 mm., lapping is not permissible
Compressive strength of bricks is 3.5 N/mm2
Earthwork excavation toward basement over 3 m should remain in stepped form
Cement should be preserved in dry places on a raised platform roughly 200 mm
Electrical conduits should not be set in column
For more information, watch the following construction video.

Read more

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, May 23, 2016

Designers Ron Culver & Joseph Sarafian Jointly Develop An Exclusive Method To Cast Concrete In Lycra Stretched With Robotic Arms

Both the designers Ron Culver and Joseph Sarafian have discovered a unique system for casting concrete in Lycra stretched with robotic arms. This newest method can be applied to develop basic new architectural forms (+ movie).

The Fabric Forms project comprises pouring a concrete fibreglass mixture into Y-shaped Lycra sleeves stretched into position through six-axis robots.

This casting system can be implemented at different scales in the construction jobsite in near future. It can be expanded to form unique building facade elements as well as the primary structure of a building.

With its simple production capacity, the fabric facilitates the users to generate various shapes devoid of casting a unique mould each time they create a new shape.

Fabric Forms facilitate to produce compound curvature beyond a cast object that would otherwise be lost once rigid formwork is eliminated.

It is considered as a more endurable substitute that can minimize labor and material costs. It is more rapid process as compared to conventional construction methods.

Conventional casting methods are both laborious and unsupportable as plywood formwork is frequently exposed and casted off as soon as concrete has cured.
When the concrete is set, the fabric is then exposed that leads to marginal waste. The pieces will require roughly 45 minutes to solidify and are set collectively through a 3D-printed coupler for generating larger assemblies that could be later on utilized as attractive facades or even load-bearing structures.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Friday, March 4, 2016

Construction Master Pro - Optimize the construction math calculation with Advanced Feet Inch Fraction

Calculated Industries, Inc. develops Construction Master® Pro compatible with iPhone and iPad. This construction tool is available in two models : #4065 and #4080 (CM Pro with Trig). If you want to switch over from an iOS device to an Android device, a new license should be purchased.

Construction Master® Pro is useful for standard advanced construction math calculations. This construction calculator offers huge benefits to the Architects, Builders, Contractors, Designers, Draftspersons, Engineers, Framers/Carpenters and Tradesmen. It can easily & perfectly resolve a complex construction math problem as well as minimize errors in the construction jobsite or office. The calculator is also used to diminish costly errors in the estimating, bidding and construction processes.

Construction Master® Pro contains the following features :-

• Entry Editing Backspace Key having a swipe of a finger (left - to - right)
• The users can access an in-depth guidance in English or Spanish from www.calculated.com
• It contains complete trigonometric function like sine, cosine, tangent, arcsine, arccosine and arctangent
• Robust in-built solutions can easily finish layouts, plans, bids and estimates
• Include and transform amid all building dimensional formats: feet-inch-fractions, inch fraction, yards, decimal feet (10ths, 100ths), decimal inches and metric (m, cm, mm)
• In-built right angle functions can make the process easy for square-ups, rafters, slopes and more


The most updated version is 1.4.3 and it contains some new features like settling bug while changing from degrees to DMS (64-bit device users only).

BUILT-IN SOLUTIONS: Dimensional Math and Conversions.

• Feet-Inch-Fraction, Inch Fraction, Yards
• Decimal Feet (10ths, 100ths), Decimal Inches
• Preset Fractions (1/2" through 1/64") 
• D:M(worry), Decimal Degree Entry and Conversions
• Full Metric Function (m, cm, mm)


Right Angle Solutions:

• Complete Right Angle/Rafter Calculations
• Pitch Key (Slope and Grade)
• Rise, Run, Diagonal/Common Rafters
• Hip/Valley Key
• Jack Rafters Key
• Irregular Hip/Valley and Jacks
• Rafter Cutting Angles (Plumb, Cheek and Level Cuts)
• Stair Layout Key
• Stair (Advanced – Riser Limit, Stairwell Opening, Headroom, Floor Thickness)
• Diagonal Key
• Expanded Rake-Wall
• Arched Rake-Wall


Link for download Construction Master Pro

Area and Volume Solutions

• Square and Cubic
• Roof – Bundles, Squares, 4x8 Sheets, Pitch, Plan Area
• Drywall, Siding and Paneling 4x8, 4x9 and 4x12
• Column/Cone Area and Volume
• Basic Circular Calculations
• Advanced Circular Calculations
• Weight per Volume Conversions
• Length, Width and Height Keys
• Blocks, Footings


Special Functions:

• Trigonometric Function Keys: Sine, Cosine, Tangent, Arcsine, Arccosine, Arctangent
• Board Feet
• Studs: Find number On-center
• User-Definable Preferences
• Cost per Unit (total costs based on unit price)
• Equal-Sided Polygon
• Compound Miters
• Crown Angle
• Paperless Tape
• 4 Memories


Construction Master Pro

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Monday, November 2, 2015

Pavers Mate (Block Paving Sand Screed Tool) is a useful construction tool for domestic block paving

Pavers Mate is an easy to use & useful construction tool that is specifically developed to create the exact layer each time toward domestic block paving as well as minor commercial area jobs through the application of sand screed. Pavers Mate can also facilitate the placing of calibrated paving slabs with a cement screed. While placing paving on a cement screed, the Pavers Mate can be used to set any size area.

Pavers Mate contains a 930mm Polypropylene screed and with this one can place 900 mm long paver. The additional 30mm of the tool is exceeded to make sure that the paver going to be placed contains a full layer and make the process simpler for the user to screed again for the next paver.

The screed is changeable with sliding up or down to the desired depth based on the measuring increments on the back of the screed for arranging to the exact depth and tightening the wing knobs/adjusters manually to clamp it into place.

After completing this simple step, set the ware plate end of the level on the datum paver and provide good pressure against the paver and do not provide any pressure on the other end Drag across the surface to generate the accurate layer every time.

This tool excludes rocking pavers and minimizes cracks which may generally occur with irregular layers.

Some exclusive features of Pavers Mate:


  • Place paving smoothly & easily.
  • Generate the accurate patio.
  • Lightweight.
  • Work with all types of calibrated pavings.
  • Removes Rocky Paving.


Link for purchase bricky.com


Block Paving Sand Screed Tool
Image Courtesy: bricky.com

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Wednesday, September 23, 2015

Different types of construction equipments for reinforcement steel bar bending

1779, 1780, 1782 - Rebar bending machines for building construction sites: FEAL PROGETT has developed the automatic rebar bending machines. These construction machines are specifically designed toward small building construction sites. The machines contain wheels for short displacement on site.

1783, 1784, 1785 - Rebar bending machines having 2 extended saddle for double bend: Besides containing wheels for short displacement on the construction site, these machine also contain 2 extended sliding saddleshaving holes for double bend.

1785B - Rebar bending machines having 4 sliding saddles for special bends: The machines automate the process toward rebar bending for large building construction site. The machines consist of wheels for short displacement on the construction site. Besides, the machines also contain 4 extended sliding saddles having holes for special bends.

1786, 1786B - Rebar bending machines which include computer 20 angles selector: These types of machines are intended for large building construction site and there are 4 extensive sliding saddles which contain holes to be utilized for special bends. These machines are provided with computer 20 angles selector.

1787 - Bar bending machines for high performances: These types of Rebar bending machines are used for large building construction sites for greater production. These machines are capable of bending reinforcement steel bar up to 60mm diameter.

All the above machines are developed by FEAL PROGETTI and useful for dealing with reinofrcement steel bar in construction jobsites. All the machines are furnished with wheels for short displacements.

Automatic SEAM rebar bending machines are supported with electric motor, gearbox having gears and pinions in hardened steel performing in a oil bath and having driving shaft toward the circulation of the working plate to handle all diameter of reinforcement steel bar suitable for various types of bends and/or stirrups.

There are control board having superior quality components, IP54 water proof, micro-switches, emergency push buttons as well as magneto-thermal switch & fuses for protecting overloaded motor ,within Rebar bending machines.

Different types of construction equipments for reinforcement steel bar bending download

Rebar bending machine 1779 contains three-phase or single-phase electric motor.

Rebar benders 1783, 1784 and 1785 are available with 2 extended sliding saddles containing holes for double bend.

Rebar benders 1785B, 1786, 1786B and 1787 comprise 4 extended sliding saddles for special bends.

Rebar bender 1786B is furnished with computer 20 angles selector.

All SEAM REBAR MACHINES contain the following features : Computer 20 angles selector, Measuring-bending stirrups device, Big radius equipment, Spiral and hoops equipment, Steel benches with rollers and All rebar bending machines are provided with set of bushes, pivots and remote foot pedal.

Different types of construction equipments for reinforcement steel bar bending

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Monday, February 2, 2015

Vacancies for Quantity Surveyors and Client-side Project Managers

Rider Hunt, provider of a complete range of consultancy services along with Project/ Programme Management, Contract Administration, Employer's Agent, Quantity Surveying, and other Client and Contractor-side roles, is seeking Quantity Surveyors and Client-side Project Managers for its Manchester (Bury) office.

For the position of client-side project manager, the candidates have to accomplish full client-side pre- and post- contract project management of design and construction projects, together with the following responsibilities :-
  • Establish a robust client brief
  • Handle cost, program, and quality
  • Deal with and supervise design
  • Control change, risk, and issues
  • Tendering / contractor selection
  • Take on full contract administration through NEC3 and JCT
  • Take part and chairing meetings involving clients, contractors, and designers
  • Supervise work on site
  • Support to the Partners with wider Client-side duties (project business cases, post-project evaluation etc)
The candidates have to report directly to the Partners, and should undertake full responsibility for dealing with smaller and medium sized projects (up to £10m); and will provide thoroughly project management support to most important projects (£10m+).

For the position of quantity surveyor, the candidates have to take responsibilities for quantity surveying/ cost management on several design and construction projects, along with all pre- and post- contract duties, as well as the following functionalities :-
  • Cost planning and budget setting primarily
  • Measurement of quantities to SMM7 and bills of quantities generation
  • Making tender documents
  • Assemble construction contracts, together with JCT and NEC
  • Agreeing target costs/ contract sums and supporting information
  • Carry out monthly valuations and assessments
  • Agreement of final accounts
  • Get monthly financial reports ready
The candidates have to report directly to the Partners, and should undertake full responsibility for controlling their own projects.

Candidates must contain the following necessary skills/ qualities:
  • Possess a degree in a proper technical subject
  • Be chartered (or near chartered) with RICS, APM, ICE, CIOB or equivalent; or if not chartered be of sufficient seniority and with sufficient experience to undertake a senior role
  • Should contain verifiable experience of taking responsibilities for a similar Client-side role with least supervision
  • Should be experienced dealing with public sector projects, added advantages will be given for having some healthcare experience
  • Well versed with working on JCT and NEC contracts, and ideally experience of working under an NEC Option C Target Cost contract and/or NHS ProCure21/21+ procurement route
  • Should contains sound written and verbal communication skills
  • Should have good IT skills as well as well versed with common software packages
  • Candidates should be fully entitled to work in the UK, and are expected to have a full UK driving licence with access to a vehicle for work purposes.
Application method: Send a detailed CV explaining your specific experience relevant to this role, along with your specific duties and responsibilities; together with an indication of your salary expectations, your current availability/ notice period, and a minimum of 2 referees (ideally from recent clients).

Applications should be sent via e-mail only to: mail@riderhuntmanchester.co.uk, with 'Place North West' in the title.

Vacancies for Quantity Surveyors and Client-side Project Managers

~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~

Friday, December 26, 2014

10 biggest upcoming construction projects in U.S. started in November 2014

Go through the following lists which enlist the 10 biggest upcomingconstruction projects in U.S. started in November 2014.

The construction professionals can locate these types of projects geographically as well as get clear ideas regarding the commencement of the jobsite works.

The biggest projects categorized by their nature, can provide a great impact on total dollar and square footage volumes.

Besides, the time period and size of these projects also affect market forecasts.

  • New Jersey: Engineering/Civil - Hackensack River Wittpenn Bridge, New Jersey Department of Transportation - $200
  • New York: Engineering/Civil - Hugh L Carey Tunnel & Brooklyn Plaza, MTA Bridges & Tunnels - $283
  • New York: Commercial - South Ferry Terminal Complex Electical & HVAC, Whitehall St NTA New York City Transit - $194
  • Florida: Engineering/Civil - Tampa International Airport Automated People Mover, 4160 George J Bean Pkwy, Hillsborough Co Aviation Authority - $197
  • Kentucky: Jefferson County - Institutional, USACE Great Lakes District Building Facility, US Army Corps of Engineers District - $240
  • Louisville: Institutional - Louisville District Mission Boundaries Building, US Army Corps of Engineers Louisville - $200
  • Louisiana: Shreveport - Industrial, Benteler Steel Tube Manufacturing Plant, (1 structure; 1 story) 11650 Highway 1 Benteler Company, - $975
  • North Dakota: Engineering/Civil - Fargo Water Treatment Plant (WTP) Membrane, (1 structure) City of Fargo - $236
  • California: Commercial - Sacramento Kings Arena, (1 structure; 7 stories) L Street, Fulcrum Group - $448
  • San Francisco: Residential - Transbay Block 9 Apartments Design Build, (1 structure; 42 stories) 1st & Folsom Sts(Northwest Corner), BRIDGE Housing Corp - $250
10 biggest upcoming construction projects in U.S.

10 biggest upcoming construction projects in U.S.

~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~

Thursday, November 27, 2014

Excel construction schedule templates for project management

The Construction Schedule Templates for Excel are actually reason built Excel templates designed to address scheduling in residential, commercial and generic construction projects. The Construction Schedule Templates for Excel are based on 5-day schedules but can be reused on an ongoing basis as required.

The Team www.business-spreadsheets.com has done this amazing templates. Construction Schedule Templates for Excel keep track of construction processes enabling homeowners, builders, designers and construction managers to plan and manage construction jobs in the most efficient and effect way possible to save money and satisfy client requirements in the least time possible.

These Construction Schedule Templates for Excel are ideal for quickly building construction schedules for any type of project and include Gantt charts that adjust automatically to task items and dates. The templates are preloaded with primary tasks and sub tasks to facilitate the entering of information and customization.

Key features of the Construction Schedule Templates for Excel include:

  • Easy to use with professional style presentation and results.
  • 100% Satisfaction Guarantee.
  • Reuse the templates over and over again as required.
  • Gantt bars automatically fill in the dates of performance.
  • Color changing to automatically indicate percentage complete.
  • Red bar to clearly show current date.
  • Scroll bar inside sheet to see tasks and scroll within the bar chart.
  • Integrated help inside the templates.
  • Establish time lines that everyone can understand.
  • Indicate owner provided items.

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~