adsense analytic

Showing posts with label construction estimating institute. Show all posts
Showing posts with label construction estimating institute. Show all posts

Saturday, June 21, 2014

HVAC Take off

We provide HVAC take off services including piping and sheet metal takeoff to be completed on digital drawings for plumbing, piping and mechanical contractors estimating the cost on Commercial, Industrial, and Residential HVAC projects.

We utilize state-of-the-art HVACEstimating software and 3D Modeling tool to ensure that each piece of ductwork is precision fit to its space, connections, and supports.

We can easily find out materials and labor needs for any job using pre-built and customizable database which is adapted to HVAC and based on industry standard labor units. Contractors can get better profitability by getting the lowest-cost materials which meet up contract specifications, and check fluctuating prices for commodity products to stay on.

HVAC Take off  

~~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.quantity-takeoff.com
~~~~~~~~~~~~~~~~~~~~

Tuesday, March 11, 2014

Construction Specifications

A specification (often abbreviated as spec) can be termed as a type of a technical standard to be referenced by a contract or procurement document. It contains the necessary details concerning the specific requirements to be persuaded by a material, product, or service. The specifications are considered very important for suppliers, purchasers, and users of materials, products, or services in engineering, manufacturing, and business as these specifications cover up a extensive collection of general issues like definitions, bidding requirements, legal responsibilities, claims & payments; with details on specific items with respect to all construction project.

CSI (Construction Specifications Institute) is a renowned association that provides the standardization of construction language related with building specifications. CSI offers prearranged instructions for composing specification in their Project Resource Manual. CSI published MasterFormat, an indexing system for categorizing construction data as well as construction specifications. It consists of 50 Divisions, to be applied for integrating facility life cycle and maintenance information into the building knowledge base. Almost the entire CSI approved sections contain performance and safety obligations produced by agencies like the American Society for Testing and Materials (ASTM), Occupational Safety and Health Administration (OSHA), and several other federal and professional organizations. CSI also publish GreenFormat, an online database that includes sustainable product attributes. Manufacturers associated with the construction industry will be able to register product information based on 5 categories in a widespread online questionnaire. All kinds of product information referenced by MasterFormat divisions and titles will be available to designers, specifiers, and building constructors. Given below the detailed lists of construction specifications :-

General Requirements - Division 01

This specification will include particular administrative and procedural requisites that belong to all of the Technical Specification sections. The General Requirements consist of specifics relevant directly to a particular project and written independently for each project. These will develop the expansive administrative and procedural conditions inscripted in the General and Supplementary Conditions documents. These will be applicable to the work of ALL Technical Specification sections. This document also sum ups the scope of work, exercise of the site, owner occupancy of building throughout construction, Phased construction activities, numerous prime contract requisites and eliminations and additions to be connected with the Plans. The General Requirements narrate the Contractor's administrative, procedural and other activities which should be submitted by the Contractor. In General Requirements section the following categories will be available.
Administrative
01010 Summary
01020 Allowances
01030 Alternates
01040 Coordination
01060 Regulatory Requirements
01080 Identification Systems
01090 References
Procedural
01025 Measurement and Payment
01035 Modification Procedures
01050 Field Engineering
01100 Special Project Procedures
01200 Project Meetings
01300 Submittals such as Construction Schedule, Logs
01400 Quality Control
01600 Material and Equipment
01650 Facility Startup/Commissioning
01700 Contract Closeout
01800 Maintenance
Temporary Activities
01500 Temporary Facilities
The Contractor's Responsibility is to comprise these items in Overhead.
Technical Specifications
Divisions 02 - 16 is known as the Technical Specifications. These construction specifications consist of the written description of the specific requirements regarding with a specific product or system. The specification provisions characterize and set up the quality level processes, standards of work and material standards. Each subsection will describe the scope, technical requirements, performance requirements, material suppliers, and quality requirements. The Construction Specifications Institute (CSI) has build up the following standard MasterFormat numbering system that includes the following Continue

~~~~~~~~~~~~~~~~~~~~
Published By
Tuhin Maity
www.quantity-takeoff.com.
~~~~~~~~~~~~~~~~~~~~~

Thursday, July 18, 2013

How to measure a building work - Some necessary tips

Data needed to start for an estimate 
For starting a brief estimate, an estimator should possess the data given below : 
  •         Plans, sections and other details associated with the work.
  •          Specifications focusing on the proper nature and a class of materials for application.
  •          Lastly the proposed rates for executing various items of work. In order to find out the quantities precisely, an estimator should maintain clear, completely dimensioned, authentic and accurately scalable drawing. While digging out quantities, the estimator should abide by some good principle.

How to make an estimate
There exist three crucial steps for making out an estimate:-
1 . Detecting quantities
While detecting quantities, the measurements should be acquired from the drawings and put on the measurement sheet or dimension paper. The measurements should be based on  the unit of measurement. The unit of measurement will range from cubic meter in 1st case and square meter in the second case.
2. Squaring out 
The second phase includes preparing volumes, areas, etc. as well as casting up their total in standard units.
3. Abstracting
In the third stage, all the items with the net results acquired in the second stage are forwarded to specially ruled sheets containing rate column set for pricing from measurement sheets . A third person must verify all the calculations and each transferred entry made in the second and third stages to get rid of any mathematical or copying omissions. 
Standard Method of Measurement of Building Works
 An Estimator finds it difficult to cope up with the various systems of measurement offered by various Central and State Government departments as well as construction agencies. It also results in standing cause of controversies. So, there should be a harmonization among diversified methods at the technical level.
Principles of Deciding Unit of Measurement
The units of measurement of different items are very complicated. In order to select the ideal units of measurement, the undermentioned principles should be followed.

1. The unit of measurement should be uncomplicated and simplified to measure, record and understand.
2. The unit of measurement should designate for fair payment of concerned work.
3. In the result it should provide quantities, which should not be too little or too outsized.
4. The price per unit should not contain a very minute figure or a very large one. Usually items with higher cost will be calculated in smaller units and lower cost in bigger units.
5. The unit of measurement may at times rely upon the unit for the raw material and/or labor and/or significant dimensions.

~~~~~~~
Published by Rajib Dey

Content Writer
www.quantity-takeoff.com (An information hub for construction estimating)

Like us on facebook