Showing posts with label calculations. Show all posts
Showing posts with label calculations. Show all posts

Tuesday, July 2, 2019

Benefits of I-beams in construction

Hot-rolled steel beam having I-shaped cross section, and tapered flanges closer than wide flanged beam is known as I-beam.
I Beam contains one vertical plane and two horizontal planes or flanges which develop 'I' or 'H' structure. The vertical plane withstands the shear stress , whereas horizontal planes withstand the bending movement. I Beam is majorly utilized in construction industry like construction of manufacturing plants, multi-story buildings etc.
I-beam is frequently applied as important support trusses, or the primary framework, in buildings. Steel I beams retain structure’s integrity with persistent strength and support. The extreme power of I beams minimizes the requirement for several support structures and as a result huge time and money is saved. The stability of the structure is improved considerably.
Some vital jargons of I-Beam:
1. Flange thickness: Top and bottom horizontal plate-like segments of an I-beam are known as flange. The density of the flanges is defined as the flange thickness.
2. Flange width: The width of the flanges is known as flange width.
3. Beam depth: The height among the top and bottom surface of the steel I beam is termed as beam depth.
4. Web thickness: The vertical segment of steel I beam is known as web, and the thickness of the web is termed as web thickness.
5. Fillet radius: The curved section, where the changeover among the web and flange occurs is known as a fillet. The radius of the fillet is defined as the fillet radius.
A properly sized I Beam can be chosen on the basis of the following criterion :-
The entire method of choosing the proper size of the I beam is dependent on the basic mechanical design calculations as given below:
1. The first input necessary belongs to the steel I beam load specifications or loading details on the steel I beam.
2. Draw bending moment diagram for the specified loads and get the value of maximum bending moments (suppose M) that the steel I beam is likely to experience.
3. Select an exact size of steel I beam from a standard I beam table.
4. Determine the area moment of inertia (suppose I) of the selected steel I beam.
5. Obtain the beam depth (suppose d) of the selected steel I beam.
6. The stress developed (f) in the beam can be measured with the formula given below :
f/(d/2)=M/ I
f denotes the bending stress.
M denotes the moment at the neutral axis.
y denotes the perpendicular distance to the neutral axis.
I denotes the area moment of inertia about the neutral axis x.
7. Compare the calculated value of the bending stress with the yield stress of the steel with the purpose of verifying the safety factor of your design.
The structural design will be perfect when the size of the I-beam is accurate. The method described above is dependent on static I beam load specifications. In case where dynamic loads are concerned, it is necessary to apply FEA tools like ANSYS, Pro Mechanica, etc.
Benefits of I-beams in construction

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, June 26, 2019

How to measure concrete mix design

Concrete mix design refers to the method utilized for finding out the exact ratios of cement, sand and aggregates for concrete so that the target strength of concrete can be obtained.
For concrete mix design, different types of laboratory testing and calculations should be accomplished to get exact mix ratios. This method is suitable for Building structures where superior grades of concrete are required like M 25 and over as well as large construction projects where quantity of concrete consumption is extreme.
The main objective of concrete mix design is to arrange the proper ratios of materials so that the application of concrete becomes cost-effective to maintain perfect strength of structural members. In a project, large quantity of concrete & construction work are required and saving in quantity of materials like cement makes the construction project cost-effective.
Concrete Mix design of M – 20, M – 25, M – 30 and superior grade of concrete are measured from following steps:
Concrete Mix Design:
Necessary data for Mix Design of Concrete:
• Concrete Mix Design Date:-
(a) Characteristic compressive strength of concrete necessary at end of 28 days = M 25
(b) Nominal maximum size of aggregate applied = 20 mm
(c) Shape of Coarse Aggregate = Angular
(d) Necessary workability at site = 50-75 mm (slump Value)
(e) Quality control is performed as per IS: 456
(f) Type of exposure condition of concrete (as specified in IS: 456) = Mild
(g) Type of cement applied = PSC as per IS: 456 – 2000
(h) Method of providing Concrete on Site = pumpable concrete
(ii) Material testing data (set in the laboratory):
(a) Specific gravity of cement = 3.15
(b) Specific gravity of FA = 2.64
(c) Specific gravity of CA = 2.84
(d) The surface of aggregates is supposed to be in dry condition.
(e) Fine aggregates are abided by Zone II of IS – 383
To get details on the method of M-25 grade concrete mix design, click on the following link. civiconcepts.com
How to measure concrete mix design

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, June 8, 2019

Some vital tips to develop a column independently

A column footing generally stands for a block of concrete that is poured in the bottom of a hole with the purpose of allocating the weight provided on the column to a greater area. As a result, the columns can’t go down into the ground in due course. Given below, some useful guidelines to pour the footings independently.
Step 1 - Measure the Footing: Label the spot to locate the correct center point of the column.
After that, work out and mark out a square that is 12 inches larger regarding the size of the column, and excavate the hole. Standard depth should be 12 inches along with one extra inch for each three inches of column. As for instance, the minimum depth should be 14 inches for a six-inch column. More is always recommended.
Step 2 - Level the Bottom: The bottom of the hole should be leveled. If it is not possible to work with a shovel because of shortage of space, utilize a concrete trowel.
Then, take the measurement from the bottom 12 inches along with the depth added for column size, and fix a nail into the side of the hole at that depth on all four sides. Instead, provide a stake into the bottom of the hole, leaving that amount of the stake uncovered.
Step 3 - Measure the Concrete required: Cut a piece of wire mesh as per size of the hole, and put aside. It is assumed that minimum one full bag of concrete should be needed for the column footing or possibly more, but the formula for making perfect measurement is L x W x H / 12 to obtain the result for the number of bags required, rounded up. The height should be the distance from the bottom of the hole to the nails (or the top of your grade stake).
While arranging a column permanently, work out the concrete to fill the hole to within three inches of the top. Apply a mix containing small rocks in it since these rocks will arrange reinforcement and avoid cracking.
Step 4 - Pour the Footing: Mix the concrete based on your calculations. It is suggested not to mix excessively than required amount to fill the hole up to the nails at this time. It will be the actual footing and it should be poured discretely first, prior to adding the permanent concrete setting. Shovel or pour the concrete into the hole, but take precautions not to cave in the sides. Set the wire mesh down into the concrete, roughly halfway to the bottom.
The finishing of the surface should be smooth, but not slippery. Employ the nails as a guide for the finish depth along with them hardly over the top of the footing.
As these nails are only a guide, therefore, apply a torpedo level for leveling the footing. Allow a footing to be cured for minimum 48 hours prior to setting the column.
Step 5 - Set the Columns: While setting permanent columns, arrange one end on the footing after it is cured. Brace the column to retain it perfectly in vertical direction while checking on all sides. After that, mix the remaining concrete from your calculation and fill the hole upto three inches of the top.
Some vital tips to develop a column independently

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, March 29, 2017

Detailed Estimating Sheet

Detail sheets consist of the genuine quantities and unit prices intended for each of the construction categories. To make the estimating process uncomplicated, various formulas can be put in to carry out the calculations. It will save huge time for builder.

As soon as the detailed sheets are formed, the estimator just has to provide the take-off quantities for the different items. Line item totals, category totals as well as several line-item quantities are automatically calculated from the take-off quantities. If any alterations occur, all calculations are automatically and rapidly updated. The category totals on the detail sheets can be connected to the summary sheet in order that it automatically copies the totals from the detail sheets.

Detailed Estimating Sheet


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~