How To Arrange Bar Bending Schedule For RCC Beams

This construction video tutorial is based on BAR BENDING SCHEDULE FOR RCC BEAM.
From bar bending schedule, one can get the reinforcement calculation for reinforced concrete beam. It gives us details of reinforcement cutting length, type of bends and bend length.
In this construction video, solution is given for two beams having spans of 6 meter. 1st layer of bottom bar of beam is 32 dia and 2nd layer that is called bottom extra is 25 dia.
1st layer of top bar of beam is 25 dia and US bar (extra cover support in second layer) is 25 dia.
Clear cover = 30 mm
Development length = 50 dia
Lapping = 50 dia
To have the complete calculation process, go through the following video

How to arrange bar bending schedule for RCC Beams

~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~

Thursday, April 6, 2017

How to design a sewer line pipe

This construction video tutorial sheds light on the methods for sewer line or sewer pipe as well as different types of sewer pipe.
Based on the section, sewer pipe comes in different shapes like circular and semi circular sewer pipe, rectangular sewer pipe, elliptical sewer pipe, egg shaped sewer pipe, basket handle sewer pipe, horse shoe sewer pipe.
Here, the calculation for design is shown for each type of sewer pipe mentioned above.
In first example, the method is demonstrated for designing a circular sewer pipe that offers average discharge equivalent to 40 litre/sec. Sewage velocity is 1.5 m/sec.
The following formula is used for design calculation :-
Maximum flow of sewage = 40 x 3 (here 40 denotes average discharge)
N.B. In order to transform average discharge into maximum discharge, it is require to multiply the average flow with 2 or 3 that is recognized as multiplying factor.
Therefore, after multiplication, the result is = 120 litre/sec.
Now, convert the unit of litre into cubic meter by dividing it with 1000
The result is = 0.12 m3/sec, it is also called as cumec
Therefore, maxium flow = 0.12 cumec
But with this, the sewer pipe can flow upto 2/3 but for designing the sewer for full flow, the following method should be applied.
Full flow = 0.12 x 1.5 = 0.18 cumec (1.5 is obtained by dividing 3 by 2)
To get more information, go through the following video.