Tuesday, March 26, 2019

Specifications of cement concrete in detail

Cement, fine aggregates, coarse aggregates and water are mainly used to form cement concrete. While writing detailed specifications, explain The specifications of every single component should be narrated briefly at the time of formulating detail specifications.

CEMENT: Cement belongs to the elementary and most vital component of cement concrete. The quality of cement should be fresh while utilizing it for construction work and it should satisfy the standard specifications.

FINE AGGREGATE: Sand is utilized as fine aggregate in cement concrete. Sand particles should comprise of coarse, sharp and angular edges. Size of sand particles should be maintained in such a manner that it can move through 4.75mm sieve. Sand should be clean and does not contain dust and organic matters. Sea sand should not be applied for construction work due to extreme salt contents.

Stone dust is also applied as fine aggregate in cement concrete, but prior to application, check that it adheres to specifications.

COARSE AGGREGATE: Normally, pieces of feverous rocks are applied as coarse aggregates. These stones should be solid, strong, long-lasting and clean. The shapes of aggregates should be cubic or closed to cubic shape. The shape of coarse aggregates should not be laminated and elongated. It should be clean and does not contain from any irrelevant organic matters.

The size of coarse aggregates should satisfy the approved construction work requirements. It should not move through the sieve size of 5mm and coarse aggregates should be graded. Voids should not go beyond 42%.

PROPORTIONING: Based on their fixed ratios, cement, sand and coarse aggregates should be calculated. Prepare a standard measuring box as per the volume of one cement bag. Volume of one cement bag is 1.25 cubic foot.

When, it is required to calculate the ratio of sand, bulking of sand should be taken into consideration. Choose dry sand at the time of making calculation of proportioning. Work out the moisture content in sand and include extra volume of sand. Constantly work out moisture content throughout construction work and include extra volume of sand based on the amount of moisture. It is suggested not to compact coarse aggregates at the time of proportioning.

CONCRETE MIXING: Mixing machine is suitable for large scale construction works whereas hand mixing is chosen since it is cost-effective for smaller concrete works.

CONCRETE CONSISTENCY: Concrete consistency is based on water to cement ratio. Surplus amount of water reduces the strength of concrete and also concrete constituents can be easily detached. The quantity of water given below should be applied against 50kg cement bag.

Concrete Ratio - Amount of Water
1:3:6 - 34 liters
1:2:4 - 30 liters
1:2:3 - 27 liters
1:1:2 - 25 liters


If vibrator is utilized for concrete compaction, then the amount of water should be reduced as per suggestion of engineer in charge.

 Specifications of cement concrete in detail
Read more
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, May 5, 2018

How to make the design of a Foundation

Foundation is the portion of structure underneath plinth level up to the soil. It is directly connected with soil and it transfers the load of super structure to soil. Normally, it is located under the ground level.

If some portion of foundation is situated over ground level, it is also enveloped with earth filling. This part of structure is not in touch with air, light etc, It is considered as the concealed part of the structure.

Depth of Foundation: Depth of foundation is based on the following points-

1. Sufficient bearing capacity should exist
2. Depth of shrinkage and swelling for of clay soils, because of change in climate that may lead to appreciable movements.
3. Depth of frost penetration for fine sand and silt.
4. Chances of availability of excavation
5. Depth of ground water table
6. Practical lowest depth of foundation should not be under 50 cm. to facilitate subtraction of top soil and deviations in ground level.
7. So, the desired depth of foundation should vary from 1.00 meter to 1.5 meter from original ground level.
Footing: Footing belongs to a structure that is built up in brick work, masonry or concrete under the base of a wall or column for dispersing the load over a extended area.
Width of Foundation/Footings
The width of footings is based on the structural design. For light loaded buildings like houses, flats, school buildings etc which do not contain over two stories, the width of foundation is provided below :-
1. The width of footing should not be under 75 cm for one brick thick wall.
2. The width of footing should not be under 1 meter for one and half brick wall.
Various methods in Foundation Work: The following methods are involved in the foundation works -
1. Excavation of earth work in trenches for foundation.
2. Work out cement concrete.
3. Set the footing for raft or column construction.
4. Arrange Anti termite treatment.
5. Set Brick work up to plinth level.
6. Set Damp proof course on the walls.
7. Refilling of earth around the walls
8. Refilling of earth in the building portion up to the desired height as per plinth level.

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~~~~