Monday, August 29, 2011

The American Concrete Institute recently publish 318-11 building code


The American Concrete Institute has launched ACI 318-11 to be applied for all concrete design, construction, inspection, repair, and research professionals. The new publication includes most updated code necessary for concrete building design and construction together with the corresponding commentary.


ACI 318-11 will provide a great assistance to Engineers, architects, contractors, specifiers, building officials, students, and professors.


Key features of  ACI 318-11:
There are advancements for Reinforcement detailing for seismic applications which include reinforcement detailing for distinct segments of special structural wall systems, detailing of horizontal bars at special boundary elements, and tightened confinement details for flexural hinge regions of large beams.


In order to verify the concentration of dissolved sulfates in water, brackish water, or seawater, Test methods ASTM D516 and D4130 should be applied and to find out percent sulfate by mass in soil ASTM C1580 should be followed.


Recently accessible bend bar types are incorporated into proper provisions. Grade 80 bend bars in compliance with ASTM A615 or A706 should be utilized for non-seismic applications. Zinc and epoxy dual-coated reinforcing bars per ASTM A1055 are also now recognized.


Test records required to find out standard variation for a mixture design should be up to 24 months old. In order to execute acceptance testing of concrete  the testing agencies must adhere to ASTM C1077.


Detailing requirements for ties for circular columns have been explained thoroughly and addition made for minimum reinforcement of deep beams.


There are amendments for Detailing requirements of temperature and shrinkage reinforcement for post-tensioned slabs.



Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum  

Thursday, August 25, 2011

DraftLogic Electrical & ConEst IntelliBid 7.0 are now integrated to make electrical estimating process 14 time faster

DraftLogic Electrical, the leading electrical design software is now seamlessly integrated with ConEst IntelliBid 7.0 to feed all line voltage elements of an electrical design into electrical estimating software mechanically. Now electrical systems design, takeoff, and estimating will be put in under one roof.   

This combination will provide some great benefits to electrical designers and estimators as they can easily verify and optimize their estimate because there is NO counting, NO scaling, NO measuring, and NO take off work for line voltage systems.

The electrical designers and estimators will be able to create a completed electrical design and estimate from an architectural floor plan fourteen times faster.  

By utilizing this combination DraftLogic Electrical users can export all elements (devices, feeders, and branch circuit wiring as well as luminaires, receptacles, and motors) of their electrical design with associated details into ConEst IntelliBid's count sheets to get rid of manual counting and data entry.

Panel schedules for every panel and every circuit are settled.  Every interconnection from every Branch Circuit wiring run is settled together with support for DraftLogic Electrical's multiple circuit home run groupings facilitating the estimator not to perform any take-off and scaling work.  Vast detail about each piece of switch gear, motor, and feeder is fed into their respective count sheets, saving thousands of keystrokes.


Watch this video for live presentation


Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Thursday, August 18, 2011

Related Costs of a built construction

The owner should take into consideration the preliminary capital cost and the consequent operation and maintenance costs for a building construction. The cost component is formed with these cost categories.

The capital cost relates to the expenditures required for initial formation of the construction. The capital cost consists of land acquirement expenses along with assembly, holding and improvement, Architectural and engineering design, Construction financing, Planning and feasibility studies, materials, equipment and labor, Insurance and taxes throughout construction, Owner's general office overhead, equipment and furnishings not taken in construction, Inspection and testing.

The operation and maintenance cost over the project life cycle for succeeding years should comprise of relevant land rent, Labor and material for maintenance and repairs, cyclic renovations, Insurance and taxes, Financing costs, Utilities, Operating staff, Owner's other expenses

The extent of these costs varies according to nature, size and location of the project in addition to the management organization.

In order to compute the life cycle costs the owner should also consider the equivalent operation and maintenance cost of each alternative for a suggested construction.

In a construction budget there should be arrangements for allowance of contingencies or unexpected costs all through the construction process. This contingency must be contained in each cost item or incorporated in a single category of construction contingency. The amount of contingency depends on historical experience and the predictable complexity of a particular construction project. The contingency expenses for a construction may be associated with design development alterations, schedule adjustments, general administration changes (such as wage rates), contradictory site conditions for those anticipated, Third party obligations required for the duration of construction, as for example new permits.

The owner can avail the contingent amounts not expend for construction near the end of construction to the owner. These amounts can also be considered as additional project elements.

Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Wednesday, August 17, 2011

Carbon Footprint - A brief overview

A carbon footprint is the total assessment of greenhouse gas (GHG) emissions produced through transport, land clearance, the production and consumption of food, burning of fossil fuels, like natural gas, crude oil and coal, manufactured goods, materials, wood, roads, buildings, and services. It is generally expressed in terms of the amount of carbon dioxide, or its alike other GHGs (methane, ozonem, nitrous oxide), emitted. These greenhouse gases are converted into the amount of CO2 affecting the global warming.

The carbon footprint is a division of the ecological footprint and of the more comprehensive Life Cycle Assessment(LCA). A carbon footprint is calculated for the time period of a year.

A carbon footprint is categorized as the primary footprint and the secondary footprint.
1. The primary footprint arises from direct productions of CO2 from the burning of fossil fuels together with domestic energy consumption and transportation (e.g. car and plane).
2. The secondary footprint arises from the indirect CO2 productions with the whole lifecycle of usable products related with their manufacture and eventual breakdown.

Carbon footprint provides great effect on population, economic output, and energy and carbon intensity of the economy. So once the carbon footprint is set up, some steps should be taken to decrease the amount of carbon footprint. These steps range from technological developments, better process and product management, development of substitute projects like solar or wind energy or reforestation, changed Green Public or Private Procurement (GPP), decrease the amount of energy for production requirement, decrease the reliance on carbon emitting fuels, carbon capture, carbon offsetting, consumption strategies.

In the medium- and long term, the carbon footprint has to be diminish to less than 2'000 kg CO2 per year and per person for a sustainable living.

Once the greenhouse gas emission is ascertained, they should be converted to CO2 equivalencies. Suppose one has 100 grams of NH2, then you have to convert applying a conversion factor so that it is in terms of CO2. Emission factors (grams per mile) are available from different ranging from the Environmental Protection Agency (EPA), the Energy Information Administration (EIA), and the International Panel on Climate Change (IPCC).

If you get the emission factor (e.g., 200 grams/mile) and the activity (e.g., 100 miles), the greenhouse gas emissions can be easily calculated (i.e., 200 x 100 = 20,000 grams). Each of the emissions that are calculated is specific to a pollutant (e.g., CO2, CH4, etc.).

Few people prefer to convey their carbon footprint in kg carbon rather than kg carbon dioxide. One is able to convert kg carbon dioxide in kg carbon by multiplying with a factor 0.27 (1'000 kg CO2 equals 270 kg carbon).

Carbon Footprint Calculator :
Online
Offline

Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Tuesday, August 2, 2011

How to prepare a bid estimate to win a project

A bid process is required to award the most jobs in construction industry. In a bidding contest the lowest bidder will be awarded the contract. Estimating a construction bid involve some knowledge of the building process.

The bid estimate is specific to the project conditions illustrated in the plans and specifications. The bid estimate is required by contractors and subcontractors for bidding purposes or the owner to appraise bids.

In order to prepare an accurate construction bid, the most current drawings, project specifications and copies of any addenda or change bulletins that have been issued are required. The company who is calling for the bid should render all of these documents. In case the drawings are submitted from a plan room, the addenda and bidding requirements should be checked properly.

Review the drawing and floor plans. Then review the title and symbols pages for any general project requirements.

Review the project specifications for getting most sets of construction documents. Read the section related with your trade and read the prelim section featuring general project conditions.

Measure material quantity by executing a material takeoff. As for instance, an electrical contractor should take into consideration the receptacles, switches, junction boxes, light fixtures, and length of wires and conduits along with panels, transformers and any electrical connections for equipment or mechanical work. These estimates will sum up the total material price.

Work out the labor costs. Find out the time frame for completion of the job and multiply this number of hours with the average wage plus any labor burden to ascertain the total labor costs.

Put material and labor costs together and comprise any special fees like permits, wage scale, bonds, insurance premiums or other costs. Multiply the total dollar figure with an appropriate percentage to contain overhead and profit.

Finally prepare your bid form putting price, complete scope of work and the name of the project.
In case the project is different from typical designs, the contractor should evaluate the actual cost of construction by taking the actual construction procedures to be used and the related costs.

Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Saturday, July 30, 2011

Some new technologies for Perfect bidding and estimating

Perfect bidding and estimating plays a vital role for construction industry to measure the profitableness in the construction industry. In order to achieve this every construction firm should utilize right technology as it will develop and increase functionality across the construction job cycle and create more value to contractors.

C-BID Services (www.cbidservices.com, ) a leading provider of comprehensive bid solicitation is making partnership with PlanSwift, a takeoff and estimating solution by Tech Unlimited Inc. C-BID’s online planroom assist you to store, organize and distribute your plans online from one easy to use centralized location with a bid-document library where significant bid information (project documentation, up-to-date bid information, drawings, specifications, and addenda ) can be accumulated.

Online plan room also contains a digital filing tool that can be utilized by bid participants to invite, bid and respond. As the plan room utilizes a recognizable approach to folder structure and document organization, it can be easily incorporate into workflow.

By contributing The Plan-Room digital file tool to PlanSwift takeoff and estimating software, C-Bid and Tech Unlimited can greatly influence the general contractors for getting rid of manual takeoffs and lessen the margin for error by storing bid documents in the cloud.

Recently, new technology incorporations between JB Knowledge Technologies’ SmartBidNet, www.smartbidnet.com, College Station, Texas, and jobsite123.com, www.jobsite123.com, Fort Lauderdale, Fla., will connect general contractors employing SmartBidNet with subcontractors on jobsite123.com. This will enhance bidding and estimating for both general contractors and subcontractors.

Besides, SmartBidNet and Cloud Takeoff from To Scale Software, www.toscaleplans.com, Cincinnati, Ohio, built up a new partnership to meliorate the data contribution and collaboration for GCs and subcontractors throughout the bidding and takeoff process.

These types of partnerships are creating new opportunities to bid projects efficiently in technology-advanced construction marketplace.

Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum

Tuesday, July 26, 2011

Construction Contract - General Overview

A construction contract is a contract purposely carried off for the construction of an asset or a group of interdependent or interrelated assets relating to the design, technology and function or ultimate purpose or use.

A fixed price contract denotes to a contract where the contractor consents to a fixed contract price or a fixed rate per unit of output, which may be subject to cost escalation clauses in some incidents.

A cost plus contract denotes to a contract where the contractor is recouped for permissible or otherwise defined costs in addition percentage of these costs or a fixed fee.

Under IAS 11, if a contract addresses two or more assets, the construction of each asset reported for individually if (a) separate proposals were submitted for each asset, (b) portions of the contract regarding each asset were negotiated independently, and (c) costs and revenues of each asset can be evaluated. If not, the contract is reported for in its entireness. [IAS 11.8]

Two or more contracts are accounted for as a single contract if they were negotiated together and the work is interconnected. [IAS 11.9]

If a contract provides an alternative to order one or more extra assets, construction of every extra asset is accounted for as a separate contract if either (a) the additional asset dissents considerably from the original asset(s) or (b) the price of the additional asset is separately negotiated. [IAS 11.10]

Schedule of Quantities
A schedule of quantities is formed for all the projected works after the creation of architectural and engineering design. The true project cost will be determined by putting estimated unit rate adjacent to each work item. In order to keep the design intact the cost of budget should be amended with the change of building material or lower requirement of specification.

Estimation / Cost Planning
An estimate of capital cost along with direct & indirect cost and an estimate of capital expenditure containing plant , labor , material , temporary works , fixed overhead , subcontractors , suppliers , operation and maintenance etc. should be prepared for financial schedule to evaluate the economic viability. Simultaneously, an income schedule must be set up for a commercial project to anticipate the profitableness and rate of return.

Financial Support
Financing of a project, particularly for a commercial project, may significantly affect the choice of project size and type of contract to be selected by the client. In case the financial status mainly governs the size and sequence of the project, the client itself should know well about the financial schedule of its capital investment and expenditure. If short of funding, it should look for supports well in advance from outside parties or banks when necessary.

Contingency
In spite of preliminary investigations in engineering design stage, there are always possibilities of experiencing unanticipated problems after the commencing of work. With the purpose of doing away with the situation of running out of budget, the client or its engineer frequently take into accounts a contingent sum of money to cope with the unpredicted additional works.

Preparation of Contract Documents
During the design phase the engineer should have arrange for the right form of contract documents to be utilized with construction to the client. Sincere attention and sufficient time should be given to organize the contract documents failing which may cause sudden additional expenditure. Now-a-days some common forms of contract known as FIDIC Contract are available.

Preparation of Tender Documents
At the time of submitting tenders some vital information like represent the full design , detailed requirements , stage completions of works , contractor’s responsibilities , terms of payment and any other special conditions should be included into tender drawings , specifications , bills of quantities , works programme and the contract documents so that the renderers’ can easily understand the value of work to render a competitory but precise quoted price to cover the whole of the work. Inadequate information in the tender documents will cause disputes and claims accordingly throughout and at the end of the contract.

The following documents should be included into a tender:
a) Instructions to tenderers
b) Form of Tender
c) General Condition of Contract
d) Special Condition of Contract
e) General Specification
f) Particular Specification
g) Bills of Quantities
h) Methods of Measurement
i) Tender Drawings
j) Additional appendices
k) Form of Agreement

Preparation of Bills of Quantities (BoQ)
The bill of quantities contains a schedule of predetermined work items for item-by-item portion of contract works. It presents the brief description of the necessitated work and with estimated quantity taken off from the tender drawings. To get over the complete work the contract may include a series of bills which constitute a part of the tender documents for the renderers to estimate against each item with a unit rate or unit price. On the ground of the total offered price will then be developed. Assessment of the BoQ items will be based on the “preamble” and compliant with the process described in the “Standard Method of Measurement (SMM)”. A brief examination must be carried out to resolve the errors related with the “BoQ unit” and the numerical figures of the “ BoQ quantity”.

Though construction contracts are considered as the systems for evaluation construction cost, they also constitute the allotment of risk to the different parties involved in the construction. The owner is empowered to select the type of contract to be utilized for a specific facility to express the terms in a contractual agreement.