Quantity Take Off or QTO is a well known project estimating company serving to the contractors, home builders, architects, design- build firms and sub contractor trade. We are providing estimating service since 2002 with a great chronicle of success.
Monday, March 21, 2011
Bill of Material (BOM)
The Bill of material is required by a contractor to complete a contract, or by a supplier or vendor to complete an order. A bill of material can only refer to a quantity greater than or equal to one of an object.
A BOM can be demonstrated in the following formats:
A single-level BOM – This kind of BOM shows the assembly or sub-assembly with only one level of children. Thus it exhibits the components required directly to create the assembly or sub-assembly.
An indented BOM - This kind of BOM shows the highest-level item nearby to the left margin and the components utilized in that item shifted more to the right.
Generally there are two types of bills of materials available for a product engineering and manufacturing BOM. The engineering BOM usually records items in accordance with their relationships with parent product as characterized on assembly drawings. But this is not enough to neither demonstrate the grouping of parts at each stage of the production procedure nor contain all of the data required to support manufacturing or procurement. These requirements lead to compel the arrangement of the product structure to be dissimilar so as to guarantee manufacturability. Thus, engineering and manufacturing will include the different valid views for the same product.
Theoretically, the BOM is created mechanically by the CAD system but in reality there is generally human interference or even re-entry.
The following information is visible in a bill of materials:
• Header (Product or Higher-Level Assembly)
o Product/Assembly Item Number
o Product/Assembly Name
o Product/Assembly Description
o Unit of Measure
o Revision Level
• Each Component/Item
o Item Number
o Item Name
o Item Description
o Revision Level
o Unit of Measure
o Quantity per (each higher level assembly)
o Effectivity (date in and date out or serial number in and serial number out)
Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum
Thursday, March 17, 2011
American Concrete Institute introduces four new publications useful for concrete industry
The American Concrete Institute (ACI) launches four new publications focusing on the most updated concrete-related information and technology.
All ACI members are eligible to get a special discount (up to 40 percent) on all ACI publications.
In order to avail the Publications, one can call to 248-848-3800 or visit the link http://www.concrete.org/general/home.asp for online order.
The details of the publication are given below:-
Guide to Hot Weather Concreting (305R-10) This guide deals with the problems related with hot weather concreting and provides solutions like proposed preparations and methods for use in general types of hot weather construction for example pavements, bridges, and buildings.
Price: $57.50 (ACI members $35.00)
Guide to Cold Weather Concreting (306R-10) This guide focus on concrete temperature through mixing and placing, temperature loss during delivery, training for cold weather concreting, safety requirements for concrete that don’t have construction supports, figure out strength development, procedures of protection, necessities of curing and admixtures for speeding up setting and strength gain including antifreeze admixtures.
Price: $60.50 (ACI members $37.00)
Report on Corrosion and Repair of Grouted Multistrand and Bar Tendon Systems (423.8R-10) This report contains the information associated with the evaluation of corrosion damage in structures reinforced with grouted multistrand and bar tendons. The report also includes a assessment of existing practice for assessing corrosion damage and typical repair schemes together with the historical background. Specific probable problem areas for grouted tendons are explained for each critical part of the tendon.
Price: $41.50 (ACI members $25.00)
Specification for Producing a Skid-Resistant Surface on Concrete by the Use of Epoxy and Aggregate (503.3-10) This specification demonstrate the system for generating a skid-resistant surface on hardened concrete by the utilization of a multi-component epoxy resin. The specification takes into consideration controls for resin labeling, storage, handling, mixing, and application; surface evaluation and preparation; and inspection and quality. Besides, it also provides an aggregate applicable with the coating. Also obtainable in a Metric version.
Price: $32.50 (ACI members $20.00)
Posted by Rajib Dey
Business Development
Global Associates
A pioneer company in construction estimating
Join our estimating forum
Wednesday, March 9, 2011
Newly launched To-Scale Plan Center - An exclusive construction takeoff software
Advantages :
- Faster construction estimating than ever before by taking off from multiple blueprint files on screen at the same time.
- Eliminate your printing bill for estimating, for many contractors these savings will easily pay for the system.
- Share your plans with suppliers, subs, vendors, GCs or anyone else that needs to see them.
- Save time by not waiting on blueprint pages to load or to zoom in or out.
Business Development
rajib@jobs2india.com
Construction Estimating Service
Tuesday, March 1, 2011
Construction Estimating Checklist: A New Era of Estimating Service

The Checklist of Construction Estimating
But you have to follow a basic structure for your construction estimating checklist should consist. Assuming you have the name of your company and address already registered, your form should have the following main features on it: Client Information like full name, address, phone number of both work and at home, email address; Project Description like brief description of project to ensure that your estimate includes all the client wants, example would be Kitchen remodel or Bathroom remodel or roof repair and Project ID: as your business grows and you end up deciding on what software will best help you manage your business, you will need each project to have the separate id. As the hope that the client will continue to use you for other projects, each project should have their own identification.

The teamwork to create a checklist
The Estimate: Now break down all the different steps the job will entail with a cost of 10% more that you think you can do the job for. This gives the client some wiggle room to negotiate bringing you back down to where you would have estimated the job to cost but giving the client a feeling of win/win negotiations. Total the cost. But the most important part of this estimate is that it should have an expiration date. You have no control over material cost but know that your supplier revises their cost on a particular day of the week and then your estimate should be in direct correlation to that cost. Your suppliers will give you an estimate of cost in writing guaranteeing the quote till a particular date. Make sure to make note of that date and make sure to include that date in your estimate.
Now make sure to organize your estimate by phases, no more than 3 phases. As you will ask for upfront payment per phase and schedule a walk through the completion of every phase with the client. Make sure to charge them for walk through inspections as the project may require city inspections in addition to your detail inspection which cost time. But this will also help you control the client wanting to do an unscheduled inspection which would take you away from your work and may be an insurance liability.
This should give you a good idea how to get started making an effective construction estimating checklist.
Saturday, February 26, 2011
Why to Outsource cost Estimation Service?
The architectural companies always want reliable but affordable service in cost estimation. The offshore companies who are solely providing cost estimating can help the architectural firm to focus on their core business. The cost estimating companies are used estimating cost in various Civil, Architectural, Structural, HVAC, Earthwork, Material, Labour and many more sectors of US, The cost estimating outsourcing service provider focus on providing effective building cost estimation services for various small, medium or large project offering accurate cost estimation as per the client’s need. The engineers of the estimating firm have the ability to perform an in-depth analysis on the client’s input of hand sketches, 2D drawings or even blueprints and provide construction cost estimations and building cost estimations in terms of cost value. That’s why you should outsource your cost estimation project and get benefits of the accurate estimation in an affordable price.

The cost estimation service providers give the clients the cost information needed to make a bid for a contract. They also help their clients in deciding whether a proposed new product will be profitable and which endeavors are currently making a profit. All these information will help greatly the offshore architectural companies. With the help of their service they can track the actual costs as the project develops. The expert team of cost estimating can provide accurate 3D models based on the inputs from the clients and give a realistic dimension to the cost of construction of a building.
Thursday, February 24, 2011
Is It Possible To Do Estimating Correctly?

Cost estimating is one of the most difficult as well as important aspect in any construction project management. This necessary part of any project is generally handled by professional estimators. As the whole estimating process is so much complex that maximum time the main concern is whether the estimation is correct or not? The answer depends on how much experience, efficiency and foresee capability the estimator possesses. All successful estimating involves a confidence interval and an error band. For example you can say that some project will be completed on or before 5th May 2012 with a 6 percent error band or there is an 85 percent probability of the program costing $320M or less with 5 percent error band.
The probabilistic forecasting of cost and schedule is the core process applied to most of the programs the estimating companies are working on. Along with it Integrated Master Schedule (IMS) is an integrated schedule containing the networked, detailed tasks necessary to ensure successful program execution. The IMS is used to verify the attainability of contract objectives, to evaluate progress toward meeting them and to integrate scheduled activities with all related components.
The estimators need to realize that all project activities consist of random variables and that estimates using those variables based on simple statistics. The common mistakes in estimating services takes place when the estimators ignore the underlying statistical basis of projects and fail to acknowledge the variables
. Similar problem can be happen if a project is scheduled in hours and the work extends for more than a few days. The estimator should have a clear understanding about the size, limitation and other things about the project. All these things along with profound experience can help an estimation to lessen the error ration and make it successful. That’s the secret of the art of good estimating.
Wednesday, February 23, 2011
The Cornerstone of Cost Estimate
First of all he has to study the floor plan of the construction. After getting the idea clearly it’s the turn to on site field engineering. The estimator has to visit the spot and consult the geotechnical consultant to perform surface investigation to evaluate the land’s ability to provide the foundation of the structure. The estimator then has to make a proper report about all these factors.
Now the estimator has to get a clear idea about the resource of the construction and more importantly its cost which includes material suppliers, labor force, subcontractors, construction equipment, indirect cost, management and many other nitty gritty of the project. The estimator has to team up with comptroller, accountant, field superintend, project manager, purchasing manager to get all the updated data about the project.
After all the field works and reporting it’s the turn to take help of the estimating software. It will help the estimator to get all the relevant output of cost estimating like the cost, schedule and quantity of resources. In this way the estimator has to determine the cost of the project.