Categories

Monday, February 16, 2015

Classification of civil engineering drawings and importance of engineering drawings

Classification of civil engineering drawings and importance of engineering drawings
Engineering drawings square calculate however engineers and draftsmen speak the styles for a building project to a contractor, builder, or technician. In engineering science, elaborate drawings square calculate made for each stage of a building project, from tendering the agreement to post-completion. Drafting is that the very best thanks to assemble a compendious record of a project. Engineering drawing is time and again the start line in a very long series of events that finally directs to the assembly, manufacture, or construction of a building.

Firstly, kinds of drawings that come with every stage of a building project and secondly, a brief conversation of the weather of engineering science draws: scale, projection, and lines.

Classification of technology Drawings: There area unit four basic forms of technology drawings.

  • Tender Drawings
  • Contract Drawings
  • Working Drawings
  • Completion Drawings

Every drawing communicates to its phase within the building project, from start (tender) to finish. The difference between every drawing could also be neglectful or essential betting on the specific project. In small-scale and easy comes, as an example, there's typically very little difference between the tender drawing and also the completion drawing. If forceful changes area unit created mid-project, the operating and completion drawings could also be audibly completely dissimilar from the tender and agreement drawings.

Tender Drawing: A tender drawing is equipped early in the building method, and is used by contractors for developing bids. Tender drawings, jointly with the other tender documents (bill of quantities, specifications, etc.), give details the project scheme to the contractor so that he or she can price the construction work accordingly. Tender drawings are geared up by engineers with clearness of sympathetic in mind.

Contract Drawings: The engineer can bring on with a more detailed design only after the completion of tender drawings and the bidding process. After assessing the contractor's bid, the engineer contrast the contractor's appraisal of the project to the tender drawings to make the essential modifications based on the planned constructional methods and budget.

These drawings and the engineer's report are built-in, in the documents ready for the lawfully binding agreement between the contractor and the project's commissioner. For some projects, if tendering has been clear-cut and without any alternate offers, the contract drawings can be the same as tender drawings.

If alternate proposals have been established, new or additional drawings will need to be equipped according to the accepted tender proposals and alternatives. Contract drawings are printed on good fineness paper and given a cloth backing, and are meant to endure long-term storage.

Working Drawings: Working drawings are normally more full than tender and contract drawings. These plans tell the actual work and manufacture of a building or other project, and represent the engineer's final decisions regarding an assortment of details.

For simple projects, the working drawings may not significantly differ from tender or contract drawings. However, for very large projects or projects with simple tender drawings, working drawings need to be much more detailed than earlier drawings. They are often complemented by finer design and construction details in the form of notes and additional written instructions.

Completion Drawings: Conclusion drawings are the final set of drawings made in a building project, and their reason is to record the project as it was built. During any given scheme, ad hoc changes are likely to have been made that deviate from the working drawings. These variations, additions, and alterations may be due to unexpected site conditions or budgetary concerns. Even the smallest disparity is recorded in conclusion drawings, also known as record or as-built drawings.

Classification of civil engineering drawings and importance of engineering drawings
Image Courtesy: wisegeek.com

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

No comments:

Post a Comment