Engineers are always looking for excellence in construction. But they have to follow some basics before starting the mega project.
The site engineers generally concentrate much on those issues:
- Bars which have the diameter more than 36 mm should avoid lapping.
 - The maximum chair spacing is 1.00 m (or) 1 No per 1m2.
 - Minimum 12 mm diameter needed for dowel rod.
 - 12 mm diameter bar should be used in chair.
 - The longitudinal reinforcement should follow the range between 0.8 – 6 per cent of gross CS.
 - For circular column, bars would be 4 Nos and 6 Nos.
 - Slabs are important in any construction. The main bar slab (8 mm HYSD) or 10mm (plane bar), distributor should not be less than 8 mm and more than 1/8th of slab’s thickness.
 - 125 mm is minimum slab thickness.
 - Concrete free fall maximum maximum 1.50 m.
 - Remember lap slice should not be used in the bar larger than 36 mm.
 - Brick water absorption should not be 15 per cent.
 - PH value of water has to be 6.
 - Brick compressive strength 3.5 N / mm2.
 - 8 kg per MT is the measurement of steel reinforcement binding wire.
 - Samples for ore cutting test in the soils filling for every 100m2.
 
Density of Materials:
Bricks: 1600 – 1920 kg/m3
Concrete block: 1920 kg/ m3
Reinforced concrete: 2310 – 2700 kg/ m3
Cube samples required for different quantity of concrete:
Quantity of Concrete 
 | 
No. of cubes required 
 | 
1 – 5 m3 
 | 
1 No’s 
 | 
6 0 15 m3 
 | 
2 No’s 
 | 
16 – 30 m3 
 | 
3 No’s 
 | 
31 – 50 m3 
 | 
4 No’s 
 | 
Above 50 m3 
 | 
4 + 1 No’s of addition of each 50 m3 
 | 
Curing time of RCC Members for different types of cement - Super Sulphate cement: 7 days, Ordinary Portland cement OPC: 10 days and Minerals & Admixture added cement: 14 days.