A variety of Functions of cost estimate in construction push you to success

Now- a- days construction becomes that business field which is changing rapidly with the changes of the society. As the total civilization is changing across the world, the demands of people are almost changing with the necessity of present situation. Ultimately the total process of construction is changing itself. To accommodate with the new kind of changes an ideal businessman must concentrate on his project as well as his project cost. Otherwise he or she can not be able to make him or herself stand steadily in the construction business.

So to be a successful businessman you must aware of the importance as well as the functions of the cost estimate in construction

Estimate Project Costs:
To determine the total cost of the project is the main function of cost estimating in construction. To estimate the individual costs of each major component of the project is the second stage of cost estimation. Even when the construction planning begins the project-wide estimate is often done before it. It is one of the vital determining factors in the final cost estimating process.

The factors behind the estimation:
The estimates for the individual parts of the project get underway once the total project budget is established. The estimates for the project depends on all the materials, labor, equipment and subcontractor costs. Such other general conditions like permit costs, temporary office costs, and utility and insurance costs also work as the “factors” behind the estimation.

Developing Materials List:
Materials keep an important part in estimating the cost of the whole project. If the list of materials becomes long, the cost of the project automatically becomes high. In that case the estimation will be done based on the high cost of the project. So an estimator must be careful about the list of the materials as it is an essential part of determining the cost of the whole project before the construction starts at all.
Some materials in a project must be looked at more critically during estimating because slight differences in their features can make big differences in their costs. And individual cost difference makes a great effect on total cost of the project as we have already discussed before.

Specify Equipment Needs:
Equipment to move materials, people and earth must be included in the final project estimate. As the estimators consider how the work will get done, they have to think about what equipment & what kind of equipment will be necessary; as the cost depends on the quality & quantity of the equipments. Estimators have to decide if certain equipment will be hired, or if there is contractor-owned equipment that will do the job. The required equipment must be specified on the project schedule for hiring, and in the case of owned equipment the equipment managers will be notified so that the hiring cost will be saved as well as the estimation will not reach at so high.

Simply, we can say estimation is just like a budget. If we can maintain our budget we will definitely save certain money for our future as we have already decided while do the budget. Similarly, if we can estimate the cost of a project properly we will definitely make a good profit which we may utilize in another project. On the contrary, if we can not we must have to face a big failure. So we must aware of the functions of cost estimate in construction to meet the success.

No comments: